My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 7/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 7/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 8:58:52 AM
Creation date
7/3/2024 8:57:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
7/3/2024
Council Approval Date
6/26/2024
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Reservoir 3 Replacement Phase 1 CONTRACT - 4 <br />Work Order No. UP3739 00 52 13 <br />for the purpose of indemnification and defense as provided in this Contract, the Contractor <br />specifically waives any immunity under the State Industrial Insurance Law, Title 51 RCW. The <br />Contractor expressly acknowledges that this waiver of immunity under Title 51 RCW was the <br />subject of mutual negotiation and was specifically entered into pursuant to the provisions of <br />RCW 4.24.115. <br />11.Repair of Damage. The Contractor agrees to repair and replace all property of the City and <br />all property of others damaged by it, its employees, subcontractors, suppliers and agents. <br />12.Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under <br />this contract is to be done at the Contractor’s risk and that: (1) prior to submitting its proposal or <br />bid, it became familiar with the conditions of excavation, subsurface, backfill, materials, climatic <br />conditions, location, traffic, and other contingencies that may affect the work and has made its <br />bid or proposal accordingly and (2) that it assumes the responsibility and risk of all loss or <br />damage to materials or work that may arise from any cause whatsoever prior to completion. <br />13.Headings for Convenience Only. The headings in this document are for convenience <br />only, and shall not be used or considered to interpret or construe this document. <br />14.Effective Date/Counterparts/Signature. This Contract is effective as of the date of the last <br />person to sign it, and may be executed in multiple counterparts, each of which shall be deemed <br />an original. This Contract may be signed with AdobeSign, and any such signature is fully <br />binding. <br />Remainder of Page Intentionally Left Blank
The URL can be used to link to this page
Your browser does not support the video tag.