My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACE 7/2/2024 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2024
>
PACE 7/2/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 9:12:49 AM
Creation date
7/3/2024 9:12:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
PACE
Approval Date
7/2/2024
End Date
12/31/2024
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Forest Park Pickleball additional Survey and Engineering Work
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004222
Total Compensation
$14,924.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
PACE Engineers 3/6/2024
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Additional Scope and Fee for Structural Services <br />Scope of work: <br />Estimate gravity and retained loads in accordance with the Washington State <br />Building Code. <br />Design one standard retaining wall that may be used throughout the project site. <br />Develop drawings to illustrate the design concepts. <br />Issue drawings and calculations stamped by a Professional Engineer licensed in <br />the State of Washington. <br />Assumptions: <br />All walls will be cast-in-place concrete. <br />The City will provide design criteria for vehicles that may drive on the retained <br />surface. <br />All meetings and coordination will be held virtually. <br />Borings to be done by others <br />Exclusions: <br />All services not explicitly delineated above. <br />Advanced analyses for lateral spreading, liquefaction, and other seismically <br />induced soil movements impacting the retaining walls. <br />Special provisions for specifications. <br />Cost estimates. <br />Site visits. <br />Services during construction. <br />PACE-SURVEY Fees: <br />Services $6,424.00 <br />Locates $ 500.00 <br />Survey Subtotal $6,924.00 <br />PACE-Structural <br />Engineering $5,536.83 <br />Borings (performed by HWA) $ 900.00 <br />Management Reserve--to be used as directed by the City of Everett $1,563.17 <br />Engineering Subtotal $8,000.00 <br />Total-Amendment No. One $14,924.00
The URL can be used to link to this page
Your browser does not support the video tag.