Laserfiche WebLink
a Cz F,i <br />� I J r r , r <br />co Ho <br />CJ <br />L J <br />m <br />L� lJ <br />Z z <br />D N <br />3W <br />yaddtess: <br />irtl istered destgr[ ptufess{Deal oanle: <br />ditsngn pin, signatluki: <br />Root afaa: ZZ "t tt' (pet @tnkting uetmit) <br />Valltte l R-..4j� FioatS: <br />Atilt R•A�j <br />Above wade W2 - <br />Below, int, R. Doom <br />t3eiow< exf. R- <br />uncond+ltoned space <br />stab-.on.0iAde floor R• <br />Fully insulated slab'? YjU (Cove wiY <br />tivVat" ofWYFrjd4Y*%9. SkylIyhts and Doors <br />area weigtlted il-valute from Glazitrg WoAshee?t <br />in Type Ututiper tf to 51 <br />3Y t; COWS selescted 0 to <br />Normalization CrMfiI <br />Water <br />a tw-*o - <br />annual generator) <br />t elect pre) <br />+Total Energy C r edits <br />HVAC System blfrt Leakooe T <br />Circra cnr <br />A:l dtictw oOt and Litt handlet in comittiot*ii space •? ()>uC41i 4A Y or N <br />Aft clurtwo0 in uticemdainned spaces AttrWd alai teitw:t at 3?s total leakaget and air Y (it N <br />Handler in corx honed space? (See UPOWt 4.1.1 <br />All ductwodt A air handler outside conaboned space insulated to minrmurn R-87 Y or fi <br />All han(ter present at duct leakage tryt? {Total leakage dA, if Yes, ape it no) Y n? N <br />HVA£ leakap to autstde test conducted at riral? Y or N <br />Do "VAC duct l,eaitage tests arctude GPS and time atrnnp verification? V to N <br />HVAC <br />system <br />Wakage <br />test <br />CalCulated design target: <br />CFtf <br />25 <br />Pa <br />HVAC <br />SyStern <br />lerrlwoe� <br />test <br />measured restf))s: <br />C FM <br />25 <br />Pa <br />dwelling unit leakage test cafclilated debi$r2 target: ACH @ 50 Pa <br />3lf3, f.1.3% Dwelling unit leakage tPSL m"Swed re'sulfH: At tf 4@ 54 G.i <br />. AverlsvN ate Uu.. Whc,4e Sull(ling Leakage test (112 non corridor Oil ttN�ign target: C : Sf @ 4AI Pa <br />-- - - ---. ----- Witcie Buildmg Leakage test IR2 non corrjdor only) rlo4isured: _ IFM.,st @ `u Fa <br />its 1 i able R406"j . Do building leakage tPsis include GPS and finis sE.3rrar ver)�l,titon�-` <br />y' r.N N <br />W)Ol'e ffvusp VerfVttation SOMM MOMOod flow Raielq fMI .4lR -f ,4 t Ci,v aaa <br />Total Credits Are the systFin conflots correctly labeled? Y or M <br />The W,i*W Kvuse Ventilation (WHV) systelin operattc4l earl mainleinance ff7&U) Y or N <br />iter iit5tRIC110it9 were Provided to the btdfdkV ow et? <br />System design rapat+ty <br />and <br />washer <br />keftigeraux <br />Yet <br />Vetted of unvented? K Vol <br />39 fireplace; heating stove (Section R402.4.2) <br />Heating or Decorative? (Circle oriel <br />.kW <br />tOrcle ot <br />YofN <br />YofN <br />Y or" <br />YofN <br />Yircpdac:e etfknency AFE) _ <br />ta: <br />IN) <br />leite; <br />Whole K` V" Ventna(kn System Type: (('iry�e or*1 - — — <br />11) Whole henisP exhaust fan. location <br />:21 Balarreed HRV; ENV. location <br />For R2low Jise, so <br />fVft more that) on,4�' tttlr(? Y 04 N <br />Q) Supply rt HRV WHV integral to the air nandW. )(.Scribe system control sequence of <br />operatitnts of rAfg(CO"CB to design Submittal, <br />Specify fun -time: _ hoots per d" <br />WHY calculated Z FU <br />design mneir3*tire flow t W""`-- <br />�@ per plan 4t>brl7ittal: <br />WH'V measured atin Nory note at COM;ntasioning: Exh.wst _ CFM. Supply a fAi <br />Cie WHV flow lasts Include GPS & =,ime 3 <br />_ _ gimp verification? ......... <br />y of N <br />HRV''ERV eensibie heat recovery ell <br />ien�cy_ _ <br />Cominissiontnh Notes: <br />Mot Maeitpnq[Y �uircvrrenrrt - r - <br />At! other mandato <br />ry [erluaeinents of WS£C•R have Dean neat? 1 Y or N <br />