Laserfiche WebLink
TABLE OF CONTENTS <br /> ITEM PAGE <br /> TABLE OF CONTENTS 2 <br /> LIST OF FIGURES 2 <br /> MR No. 1 —Targeted Stormwater Site Plan 3 <br /> MR No. 2 — SWPPP Narrative 11 <br /> MR No. 3 —Water pollution Source Control for New Development 13 <br /> MR No. 4— Preservation of natural drainage systems and outfalls 13 <br /> MR No. 5— On-site Stormwater Management 14 <br /> MR No. 6 — Runoff Treatment 16 <br /> MR No. 7 — Flow Control 16 <br /> MR No. 8 —Wetlands Protection 17 <br /> MR No. 9 — Operation and Maintenance 17 <br /> Description of Proposed Erosion Control BMP's 19 <br /> APPENDIX A— STORMWATER CALCULATION 26 <br /> APPENDIX B— OPERATION AND MAINTENANCE STANDARDS TABLE 29 <br /> APPENDIX C— BORING LOGS 36 <br /> APPENDIX D— SOIL RESOURCE REPORT 39 <br /> LIST OF FIGURES <br /> ITEM PAGE <br /> FIGURE 1 VICINITY MAP ........................................................................................... 20 <br /> FIGURE 2 EXISTING AND DEVELOPED DRAINAGE & SWPPP PLAN ............. 22 <br /> FIGURE 3 UPSTREAM/DOWNSTREAM TRIBUTARY AREA MAP ..................... 23 <br /> Drainage Report—9227 4"Ave W Everett,WA 98204 <br /> Nov. 10, 2022 Page 2 <br />