Laserfiche WebLink
Upstream Analysis <br /> From field observation and review of the available aerial topography, it appears that the site have <br /> no offsite flow. This project will not collect any offsite runoff. The site will be graded to direct runoff <br /> away from the structures and toward the east as in the existing condition. Refer to figure 4 for map <br /> of the surrounding area. <br /> There is no likelihood that the proposed project activities could impact upstream area with backwater <br /> conditions. <br /> Downstream Analysis <br /> The project site is within North Creek basin. From a field investigation and from field topographic <br /> mapping it was determined that in the existing condition the slopes on the site generally slope from <br /> west to southeast and stormwater currently sheet flows southeast towards an existing storm <br /> drainage system on Holly Drive. <br /> Runoff from the frontage of the project site drains south along the east curb line of 4t"Ave W <br /> until reaching a catch basin about 100 feet south of the project site. Flows continue in the <br /> drainage system in a series of 12in pipes and catch basins along 4t"Ave. W toward the <br /> south until merging with the drainage system along Holly Drive. Flows then drains toward the <br /> east to a drainage system along Holly Drive and continue until reaching Evergreen Way then <br /> crosses Evergreen Way through an 18" pipe and the system continues along the south side <br /> of Holly Drive. Flows then turn south along the west side of Dorn Ave. and continue through <br /> an enclosed system through a storage facility and then discharges into North Creek. <br /> MINIMUM REQUIREMENT NO. 2 - CONSTRUCTION STORMWATER <br /> POLLUTION PREVENTION PLAN <br /> Below is a summary of the applicable elements of the construction stormwater pollution <br /> prevention plan. A full detailed plan is prepared and attached a separate report. <br /> 1 : Mark Clearing Limits <br /> The first step in the "Construction Sequence" included on the clearing and grading plan <br /> sheets is for a surveyor to stake the limits of clearing and to have construction or silt <br /> fencing placed along the limits prior to any other construction activity. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the proposed construction entrance to be installed as the second <br /> step after the staking of clearing limits. A detail is provided on the plans. <br /> 3: Control Flow Rates <br /> This project will retain as much existing vegetation as possible. In addition, Flow rates <br /> will be controlled by using SWPPP Element#4, sediment controls. <br /> 4: Install Sediment Controls <br /> This site and SWPPP proposes to construct a construction entrance and retain existing <br /> vegetation and install CB inlet protection to collect and contain the sediment on this site. <br /> Drainage Report—9227 4t"Ave W Everett,WA 98204 <br /> Nov. 10,2022 Page 11 <br />