My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9227 4TH AVE W 2024-08-12
>
Address Records
>
4TH AVE W
>
9227
>
9227 4TH AVE W 2024-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 9:19:26 AM
Creation date
7/5/2024 10:54:15 AM
Metadata
Fields
Template:
Address Document
Street Name
4TH AVE W
Street Number
9227
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. In planting beds, will place three inches of compost and till in to an eight-inch depth. <br /> c. In turf areas, will place two inches of compost and till in to an eight-inch depth. <br /> d. Apply two to four inches of arborist wood chip, coarse bark mulch, or compost mulch <br /> to planting beds after final planting. <br /> Undisturbed soils will be protected from compaction during construction. <br /> Preserve native soils by stockpiling site duff and topsoil and reapply after grading and <br /> construction. <br /> See FIGURE 2 EXISTING AND DEVELOPED DRAINAGE & SWPPP PLAN. <br /> Roofs: <br /> 1. Full Dispersion per BMP T5.30 or Downspout Full Infiltration per BMP T5.1 OA <br /> Full Dispersion is infeasible due to insufficient flow path length and lack of native <br /> forest vegetation. Full infiltration is infeasible due to site constrains, soils conditions <br /> and infiltration is not recommended on this project site. <br /> 2. Bioretention per BMP T7.30 <br /> Bioretention is not feasible due to site constrains, soils conditions and infiltration is <br /> not recommended on this project site. <br /> 1. Downspout Dispersion Systems in accordance with BMP T5.10B <br /> This BMP is feasible and will be implemented on site. <br /> 2. Perforated Stub-out Connections in accordance with BMP T5.10C <br /> Although this BMP is feasible but the project is implementing Downspout Dispersion <br /> BMP T5.1 OB. <br /> The location and types of BMPs selected are shown in the project site/drainage plans —See <br /> FIGURE 2 EXISTING AND DEVELOPED DRAINAGE & SWPPP PLAN. <br /> Other Hard Surfaces: <br /> 1. Full Dispersion in accordance with BMP T5.30 <br /> Full Dispersion is infeasible due to insufficient flow path length and lack of native <br /> forest vegetation. <br /> 2. Permeable Pavement in accordance with BMP T5.15 <br /> Permeable Pavement System is considered infeasible for the new driveway and <br /> landings due to the following: <br /> The underlying impermeable/low permeable layer that would create saturated <br /> conditions within 1 foot of the bottom of the lowest gravel base course. <br /> Drainage Report—9227 4t"Ave W Everett,WA 98204 <br /> Nov. 10,2022 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.