My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7418 HEATHER WAY 2021 Plans 2024-07-08
>
Address Records
>
HEATHER WAY
>
7418
>
Plans
>
7418 HEATHER WAY 2021 Plans 2024-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:29:16 PM
Creation date
7/8/2024 1:29:00 PM
Metadata
Fields
Template:
Address Document
Street Name
HEATHER WAY
Street Number
7418
Permit
B2105-011
Year
2021
Notes
BUILD 20'X32' STORAGE BUILDING W/ CONCRETE SLAB FOUNDATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANDREW <br /> STEWART <br /> ARCHITECT <br /> FASTENING SCHEDULE <br /> 10621 15th Dr SE <br /> Everett,Washington 98208 <br /> DESCRIPTION NO&TYPE SPACING&LOCATION 405.808,5410 <br /> andrew.keith.stewart@gmail.com <br /> ROOF <br /> - 11103 <br /> REGISTERED <br /> ARCEITECT <br /> 1. ROOF TRUSS TO TOP PLATE 3-16D BOX NAILS 2 TOE NAILS ON ONE SIDE AND 1 TOE NAIL ON THE OPPOSITE SIDE OF EACH TRUSS <br /> _ ANDREW REITH STEWART <br /> STATE OF WASHINGTON <br /> 2. END TRUSS TO TOP PLATE 8D COMMON NAILS OR 10D BOX NAILS TOENAIL 6"O.C. <br /> 3. TRUSS BLOCKING AT TOP PLATE 3-8D COMMON MAILS OR 3-1OD BOX NAILS TOENAIL CD <br /> V <br /> 4. LOOKOUT BLOCKS 3-16D BOX NAILS EACH BLOCK END NAIL Z z <br /> . U <br /> 5. LOOKOUT LADDER TO TRUSS 16D BOX NAILS FACE NAIL 6"O.C. CI ° <br /> a. <br /> 6. ROOF SHEATHING(INTERNAL) 8D COMMON NAILS OR 10D BOX NAILS 6"O.C.AT PANEL EDGES, 12" O.C.AT INTERMEDIATE SUPPORTS m <br /> 7. ROOF SHEATHING(4' FROM EDGE& PEAK) 8D COMMON NAILS OR 10D BOX NAILS 6"O.0 1- <br /> �o <br /> WALL 0 oNo <br /> 43rn <br /> 8. STUD TO STUD&CORNERS 16D BOX NAILS 12"O.C. FACE NAIL c <br /> W a) <br /> 9. TOP PLATE TO TOP PLATE 10D BOX NAILS 12"O.C. FACE NAIL V co2 m <br /> a> <br /> 10. BOTTOM PLATE TO BOTTOM PLATE 10D BOX NAILS, HOT-DIPPED GALVANIZED 12" O.C. FACE NAIL Q � >•` w <br /> 11. STUDS TO TOP PLATES 3-16D BOX NAILS END NAIL BUILDING <br /> PERMIT <br /> 12. STUDS TO BOTTOM PLATES 3-16D BOX NAILS,HOT-DIPPED GALVANIZED TOE NAIL 04.25.2021 <br /> 13. TOP PLATE SPLICES 8-16D BOX NAILS FACE NAIL EACH SIDE OF SPLICE REVISIONS <br /> 14. BUILT-UP HEADERS. 16D BOX NAILS 12"O.C. EACH EDGE FACE NAIL # DATE DESCRIPTION <br /> 15. KING STUD TO HEADER 4-16D BOX NAILS END NAIL <br /> 16. WALL SHEATHING 8D COMMON NAILS, GALVANIZED 6"O.C.AT PANEL EDGES, 12"O.C.AT INTERMEDIATE SUPPORTS <br /> N SCHEDULES <br /> F) <br /> u) <br /> A600N <br /> d <br />
The URL can be used to link to this page
Your browser does not support the video tag.