My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:23:49 AM
Creation date
7/9/2024 9:11:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Plumbing & Pumps LLC DBA Allied Trenchless
Approval Date
7/8/2024
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
20th Street Sewer Rehabilitation Projec
Tracking Number
0004427
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 11 <br /> <br /> <br />General Conditions <br />007200-11 202082-10 May 2024 <br />pw://Carollo/Documents/WA/Everett/202082-100000/04 Design/04 Specs/Carollo/007200 (FS-100) <br /> <br />The Owner’s Representative may appoint assistants and inspectors to assist in determining that <br />the Work and materials meet the Contract requirements. Assistants and inspectors have the <br />authority to reject defective material and suspend Work that is being done improperly, subject to <br />the final decisions of the Owner’s Representative or, when appropriate, the Owner. <br />Assistants and inspectors are not authorized to accept work, to accept materials, to issue <br />instructions, or to give advice that is contrary to the Contract. Work done or material furnished <br />which does not meet the Contract requirements shall be at the Contractor’s risk and shall not be <br />a basis for a Contract Claim even if the Owner’s Representative, inspectors or assistants <br />purport to change the Contract. <br />Assistants and inspectors may advise the Contractor of faulty Work or materials or <br />infringements of the terms of the Contract; however, failure of the Owner’s Representative or <br />the assistants or inspectors to advise the Contractor does not constitute acceptance or <br />approval. <br />The Contractor shall submit supplemental working or detail drawings as required for the <br />performance of the Work pursuant to 2.4. SUBMITTALS. Except as noted, all drawings and <br />other Submittals shall be delivered directly to the Owner’s Representative. The drawings shall <br />be on sheets measuring 22 by 34 inches, 11 by 17 inches, on sheets with dimensions in <br />multiples of 8 1 /2 by 11 inches, or other size approved by the Owner consistent with the Work <br />to be detailed. Contractor shall provide drawings far enough in advance of ordering or <br />installation to allow for review by the Owner’s Representative or other agencies and possible <br />resubmittal and further review after resubmittal. After a plan or drawing has been reviewed and <br />returned to the Contractor, all changes proposed by the Contractor may be submitted to the <br />Owner’s Representative for review and comment. <br />The Contractor shall obtain the Owner’s Representative’s written acknowledgement of approved <br />Submittals before proceeding with the Work represented by the Submittal. Such review does not <br />impose any responsibility upon the Owner, nor does it relieve the Contractor of any <br />responsibility for the accuracy of the Submittal or its conformity with the Contract. The <br />Contractor shall bear all risk and all costs of any Work delays caused by resubmittal or <br />correction of Submittals. The Contractor shall allow sufficient time for Owner’s review of <br />Submittals and possible corrections by the Contractor so as not to delay the Work. <br />The Contractor’s Bid price shall include all costs of all Submittals, including, but not limited to, <br />working, detail and shop drawings. <br />4. CONTRACTOR <br />4.1. CONTRACTOR'S REPRESENTATIVE <br />The Contractor shall notify the Owner in writing of the name of the person who will act as the <br />Contractor's representative and shall have the authority to act in matters relating to this <br />Contract. This person shall have authority to carry out the provisions of the Contract and to <br />supply materials, Equipment, tools and labor without delay for the performance of the Work. <br />Contractor shall employ and keep on Site on a full time basis personnel experienced in the <br />management of construction of projects of this size and type. These shall include, but not be <br />limited to, a project manager and superintendent. Neither the Contractor’s project manager nor <br />the superintendent shall have supervisory responsibility for other Projects for the Contractor <br />while assigned to this Project. Contractor shall employ and assign such additional, full time <br />office, support and engineering personnel to support the project manager and superintendent <br />and allow timely completion of the Project. The project manager and superintendent shall be <br />approved by the Owner, and such approval shall not be unreasonably withheld. Contractor
The URL can be used to link to this page
Your browser does not support the video tag.