Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:23:49 AM
Creation date
7/9/2024 9:11:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Plumbing & Pumps LLC DBA Allied Trenchless
Approval Date
7/8/2024
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
20th Street Sewer Rehabilitation Projec
Tracking Number
0004427
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 12 <br /> <br /> <br />General Conditions <br />007200-12 202082-10 May 2024 <br />pw://Carollo/Documents/WA/Everett/202082-100000/04 Design/04 Specs/Carollo/007200 (FS-100) <br /> <br />acknowledges that one of the instances in which it will be reasonable for the Owner to withhold <br />consent is if the project manager or superintendent is different than as stated in the Bidder <br />Qualification Statement. Contractor shall submit personnel qualifications within ten (10) days of <br />Contractor’s execution of the Contract. Bases for disapproval include, but are not limited to, lack <br />of sufficient experience managing the construction of similar type or size projects or <br />relationships on other projects unsatisfactory to the Owner. Owner may require removal and <br />replacement of Contractor’s supervisory staff who are disruptive or who appear to lack sufficient <br />competence to complete the Project successfully. <br />4.2. CONSTRUCTION PROCEDURES <br />The Contractor shall supervise and direct the Work and determine the means, methods, <br />techniques, sequences and procedures of construction, except in those instances where the <br />Owner, to define the quality of an item of Work, specifies in the Contract, a means, method, <br />technique, sequence or procedure for construction of that item of Work. <br />4.3. SUBCONTRACTORS <br />Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in <br />writing by the Owner before Contractor submits its Bid, the Contractor shall perform with its own <br />organization at least one-third of the Work by dollar volume and Contractor shall not sublet to a <br />single Subcontractor more than one-half of the Project. A Subcontractor of the Contractor shall <br />not sublet to another Subcontractor more than one-half of its work without the written consent of <br />the Owner obtained within twenty (20) days of award of the Contract to the Contractor. The <br />Owner may refuse to approve such subcontract for any reason. Only unit price and Schedule of <br />Value items of the Contract will be used in computing the total Work. The Owner may, at its sole <br />option, refuse to approve a Subcontractor that is also providing services to the Owner on the <br />same project. <br />Subcontractors will be considered agents of the Contractor and their work shall be subject to the <br />provisions of the Contract. References in the Contract Documents to actions required of <br />Subcontractors, manufacturers, Suppliers, or persons other than the Contractor, the Owner or <br />the Owner's Representative shall be interpreted as requiring that the Contractor shall require <br />such Subcontractor, manufacturer, Supplier or Person to perform the specified action. <br />Contractor shall comply with RCW 39.04.250 and RCW 39.76.011, as amended, and any <br />successor and other laws, ordinances, and regulations regarding payment of Subcontractors. <br />Contractor shall also comply with the requirements of RCW Chap. 60.28 and any other law, <br />ordinance, or regulation relating to the release of retainage to Subcontractors. <br />The Contractor shall specifically include in each of its first tier subcontracts the language in this <br />section with regard to the Subcontractor’s obligation to meet bidder responsibility criteria, and <br />shall require each of its Subcontractors to include substantially the same language of this <br />section in each of their subcontracts, adjusting only as necessary the terms used for the <br />contracting parties. The requirements of this section apply to all Subcontractors regardless of <br />tier. <br />At the time of subcontract execution, the Contractor must verify that each of its first tier <br />subcontracts meets the following bidder responsibility criteria: <br />1. At the time of subcontract Bid Submittal, have a certificate of registration in compliance <br />with Chapter 18.27 RCW; <br />2. Have a current state unified business identifier number; <br />3. If applicable, have: