Laserfiche WebLink
This document is a MODIFIED version of EJCDC® C-451, Copyright© 2018 by the National Society of Professional <br />Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part <br />on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in <br />copyrighted EJCDC documents remain subject to the copyright. <br />Cured-in-Place Pipe Rehabilitation Qualifications Form <br />00451F-1 202082-10 May 2024 <br />pw://Carollo/Documents/WA/Everett/202082-100000/04 Design/04 Specs/Carollo/00451F (FS-100) <br /> <br />DOCUMENT 00451F <br />CURED-IN-PLACE PIPE REHABILITATION QUALIFICATIONS FORM <br />ARTICLE 1 — REHABILITATION METHOD <br />1.01 Qualification requirements are based on experience with the following pipe rehabilitation <br />methods: <br />A. Cured-in-Place-Pipe (CIPP) Liner. <br />1.02 Experience requirements are based on experience with the following systems: <br />A. Wastewater systems. <br />ARTICLE 2 — CONTACT INFORMATION <br />2.01 Provide the following contact information: <br />CIPP MANUFACTURER NAME: <br />Address: <br />Phone: <br />Contact Person: <br />CIPP INSTALLER COMPANY NAME: <br />(subcontractor) <br /> <br />Address: <br />Phone: <br />Superintendent Name: <br />Lateral Cutting Technician Name: <br />Resin Impregnation (Wet Out) <br />Crew Lead Name: <br /> <br />Installation Crew Lead Name: <br />ARTICLE 3 — MANUFACTURER REQUIREMENTS <br />3.01 Minimum experience: 300,000 linear feet of CIPP successfully installed in accordance <br />with the Contract Documents.