My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:23:49 AM
Creation date
7/9/2024 9:11:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Plumbing & Pumps LLC DBA Allied Trenchless
Approval Date
7/8/2024
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
20th Street Sewer Rehabilitation Projec
Tracking Number
0004427
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
This document is a MODIFIED version of EJCDC® C-451, Copyright© 2018 by the National Society of Professional <br />Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part <br />on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in <br />copyrighted EJCDC documents remain subject to the copyright. <br />Manhole Rehabilitation Qualifications Form <br />00451G-1 202082-10 May 2024 <br />pw://Carollo/Documents/WA/Everett/202082-100000/04 Design/04 Specs/Carollo/00451G (FS-100) <br /> <br />DOCUMENT 00451G <br />MANHOLE REHABILITATION QUALIFICATIONS FORM <br />ARTICLE 1 — REHABILITATION METHOD <br />1.01 Qualification requirements are based on experience with the following manhole <br />rehabilitation methods: <br />A. Cured-in-Place-Manhole (CIPM) Liner. <br />1.02 Experience requirements are based on experience with the following systems: <br />B. Wastewater systems. <br />ARTICLE 2 — CONTACT INFORMATION <br />2.01 Provide the following contact information: <br />MANUFACTURER NAME: <br />Address: <br />Phone: <br />Contact Person: <br />MANHOLE REHABILITATION INSTALLER <br />COMPANY NAME: (subcontractor) <br /> <br />Address: <br />Phone: <br />Superintendent Name: <br />Installation Crew Lead Name: <br />ARTICLE 3 — MANUFACTURER REQUIREMENTS <br />3.01 Minimum experience: 200 manholes rehabilitated in accordance with the contract <br />documents. <br />3.02 Provide answers to the following questions regarding the manufacturer's experience with <br />manhole rehabilitation. <br /> YES NO <br />Is the manufacturing processes third-party certified to the latest ISO 9000 <br />standards? <br /> <br />Is proof of manufacturing process ISO 9000 certification attached? <br />Does the Manufacturer have a minimum of 200 manholes successfully <br />rehabilitated in the U.S.? <br /> <br />Does the Manufacturer have a minimum of 200 rehabilitated manholes in <br />successful service in the U.S. in the last 5 years? <br />
The URL can be used to link to this page
Your browser does not support the video tag.