Laserfiche WebLink
City of Everett 00 2113 - 2 <br /> <br /> <br />Instructions to Bidders <br />002113-2 202082-10 May 2024 <br />pw://Carollo/Documents/WA/Everett/202082-100000/04 Design/04 Specs/Carollo/002113 (FS-100) <br /> <br />3. State Requirements. If applicable: <br />a. Have Industrial Insurance (workers’ compensation) coverage for the bidder’s <br />employees working in Washington, as required in Title 51 RCW; <br />b. Have a Washington Employment Security Department number, as required in <br />Title 50 RCW; and <br />c. Have a Washington Department of Revenue state excise tax registration <br />number, as required in Title 82 RCW. <br />4. Disqualification. Not be disqualified from bidding on any public works contract <br />under RCW 39.06.010 or 39.12.065(3). <br />5. Prevailing Wage Training. Unless Bidder has completed three or more public works <br />projects and had a valid business license for three or more years, Bidder must have <br />received Department of Labor and Industries training on the requirements related to <br />public works and prevailing wage under RCW 39.12 and RCW 39.04. <br />5. Certification of Wage Compliance. Within the three-year period immediately <br />preceding the date of the bid solicitation, not have been determined by a final and <br />binding citation and notice of assessment issued by the department of labor and <br />industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br />chapter 49.46, 49.48, or 49.52 RCW. <br />6. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br />in RCW 39.04.320, not have been found out of compliance by the Washington state <br />apprenticeship and training council for working apprentices out of ratio, without <br />appropriate supervision, or outside their approved work processes as outlined in <br />their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br />immediately preceding the date of the bid solicitation. <br />1-02.1(2) Supplemental Bidder Responsibility Criteria <br />If this Project is subject to supplemental bidder responsibility criteria, then such criteria <br />will be contained in SECTION 00 2213, SUPPLEMENTAL INSTRUCTIONS TO <br />BIDDERS. If there is no SECTION 00 2213, SUPPLEMENTAL INSTRUCTIONS TO <br />BIDDERS in the bid package, then the Project is not subject to supplemental bidder <br />responsibility criteria. <br />1-02.2 Plans and Specifications <br />Information as to where bid documents can be obtained or reviewed will be found in the <br />Call for Bids (Advertisement for Bids) for the Work. <br />1-02.3 Not Used <br />1-02.4 Examination of Plans, Specifications, and Site of Work <br />1-02.4(1) General <br />The Bidder shall carefully examine the Contract Documents. Submittal of a Bid shall be <br />conclusive evidence that the Bidder has made these examinations and understands all <br />requirements for the performance of the completed Work. The Bidder further warrants, <br />agrees, and acknowledges by submitting a Bid that it: <br />1. Has taken steps reasonably necessary to ascertain the nature and location <br />of the Work, including without limitation the actual physical conditions of and <br />at the location, surface and subsurface conditions, and conditions ordinarily <br />to be encountered and generally recognized as inherent in the Work;