My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:23:49 AM
Creation date
7/9/2024 9:11:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Plumbing & Pumps LLC DBA Allied Trenchless
Approval Date
7/8/2024
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
20th Street Sewer Rehabilitation Projec
Tracking Number
0004427
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 4 <br /> <br /> <br />General Conditions <br />007200-4 202082-10 May 2024 <br />pw://Carollo/Documents/WA/Everett/202082-100000/04 Design/04 Specs/Carollo/007200 (FS-100) <br /> <br />In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples of <br />specific costs not allowed in a calculation under this section of the Contract include, but are not <br />limited to, Incentive Compensation paid to personnel classified as Overhead and otherwise <br />includable under this section of Contract, travel and business meetings, employer paid benefits <br />and taxes on direct payroll costs of any project, insurance costs directly identifiable to a specific <br />project, penalties, and costs incurred regarding company owned equipment normally classified <br />as a direct project costs. <br />Owner: The City of Everett, Washington. "Owner" and the "City" mean the same. <br />Owner's Representative: The person designated in writing and employed or retained by the <br />Owner to act as its representative at the construction Site and to perform construction <br />inspection service and administrative functions relating to this Contract. The terms “Owner’s <br />Representative”, “Engineer” and “Architect” are interchangeable. <br />Person: Includes individuals, associations, firms, companies, corporations, partnerships, and <br />joint ventures. <br />Physical Completion: Physical Completion Date is the day all of the Work is physically <br />completed on the Project. All documentation required by the Contract and required by law does <br />not necessarily need to be furnished by the Contractor by this date. <br />Progress Schedule: A schedule prepared and maintained by Contractor, describing the <br />sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work <br />within the Contract Time. <br />Project: The undertaking to be performed under the provisions of the Contract. <br />Punch List: List of incomplete items of Work and of items of Work that are not in conformance <br />with the Contract Documents, prepared after Substantial Completion. <br />Reference Information: Information provided to the Contractor by the City that is not part of the <br />Contract. <br />RCW: Means the Revised Code of Washington. <br />Samples: Physical examples of materials, Equipment, or workmanship that are representative <br />of some portion of the Work and which establish the standards by which such portion of the <br />Work will be judged. <br />Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. <br />Schedule of Values. <br />Shall: Required conduct. <br />Shop Drawings: All drawings, diagrams, illustrations, schedules, and other data or information, <br />which are specifically prepared or assembled by or for Contractor and submitted by Contractor, <br />to illustrate some portion of the Work. <br />Shown: Refers to information presented on the Drawings, with or without reference to the <br />Drawings. <br />Site: Lands or areas indicated in the Contract Documents as being furnished by Owner upon <br />which the Work is to be performed, including rights-of-way and easements for access thereto, <br />and such other lands furnished by Owner that are designated for the use of Contractor. <br />Specifications: That part of the Contract Documents consisting of written descriptions of the <br />technical features of materials, Equipment, construction systems, standards, and workmanship.
The URL can be used to link to this page
Your browser does not support the video tag.