My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 21 13 - 1 <br /> <br /> <br />00 21 13 - 1 INSTRUCTIONS TO BIDDERS <br /> <br />SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS <br />PART 1 - GENERAL <br />1.1 GENERAL DESCRIPTION AND LOCATION OF PROJECT <br />A. The Work to be performed will include furnishing all labor, materials and equipment <br />necessary to perform all Work as required by the Contract in accordance with the <br />Contract Documents. <br />B. The Project Sites are distributed among two locations: Everett Police - South Precinct, <br />1121 SE Everett Mall Way, Everett, WA 98208; and Everett Police - Downtown <br />Headquarters, 3002 Wetmore Avenue, Everett, WA 98201. <br />C. Questions and inquiries about the Contract Documents should be directed to the <br />attention of Joan Olsen, City of Everett Project Manager at 425.257.6294 or email at <br />jolsen@everettwa.gov. <br />1.2 STANDARD SPECIFICATIONS <br />A. The following other Specifications and Standard Plans shall apply to the extent to which <br />they are called out in the Contract Documents. <br />1. WSDOT “2021 Standard Specifications for Road, Bridge and Municipal <br />Construction”, as amended by the APWA Supplements, hereinafter referred to as <br />the “Standard Specifications.” <br />2. City of Everett “Design and Construction Standards and Specifications” (Revised <br />1-08), as found online on the City’s Website at: <br />https://www.everettwa.gov/2722/Construction-projects <br />3. “Standard Plans for Road and Bridge Construction,” latest edition as prepared by <br />WSDOT. <br />4. “Manual on Uniform Traffic Control Devices” (MUTCD), latest edition. <br />5. APWA Standards, latest edition. <br />6. AWWA Standards, latest edition. <br />7. American Concrete Institute (ACI), latest edition <br />1.3 EXAMINATION OF SITE CONDITIONS, CONTRACT DOCUMENTS AND <br />REGULATIONS <br />A. Bidders shall inspect the Site of the Work and carefully review the Contract Documents <br />to satisfy themselves, by personal examination, physical testing, or by such other means <br />as they may prefer, of the location of the proposed Work, the actual physical conditions <br />of and at the Site, surface and subsurface conditions, and conditions ordinarily to be <br />encountered and generally recognized as inherent in the Work. If, during the course or <br />as a result of such inspection, examination and testing, a Bidder finds facts or conditions <br />that appear to conflict or are omitted from the Contract Documents, or with other data or <br />material made available relating to the Work, Bidder shall so notify the City in writing,
The URL can be used to link to this page
Your browser does not support the video tag.