My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 42 <br /> <br /> <br /> <br />00 72 00 - 42 GENERAL CONDITIONS <br />compliance with procedures, but any such waiver of one or more items or elements does not waive the <br />necessity for Contractor’s strict compliance with any other item or element, nor shall such waiver be <br />admissible in any legal proceeding for any reason. <br />10.2 FORM OF NOTICE <br />The Notice must include the following minimum information: <br />1. A complete and accurate description of the event or events giving rise to the Notice, including <br />dates, times, and locations; <br />2. A preliminary list of persons of involved in such event; <br />3. A statement whether the Contractor believes the event may result in a Contract Claim for <br />additional Contract Time or adjustment of the Contract Sum; <br />4. A date by which Contractor shall begin providing Supplemental Information as provided in this <br />section. <br />10.3 SUPPLEMENTAL INFORMATION <br />Contractor shall supplement the written Notice as soon as possible with a written statement providing the <br />following: <br />1. The date of the event, incident, direction, and other pertinent information; <br />2. The nature and circumstances giving rise to the Notice; <br />3. The Contract provisions relating to, but not limited to, the event, incident, and direction; <br />4. The estimated dollar cost, if any, of the Extra Work, or Delay, or both and how that estimate was <br />determined; and <br />5. An analysis of the schedule showing the schedule change or disruption if the Contractor is <br />asserting a schedule change or disruption. <br />Throughout any work related to a Notice, the Contractor shall keep complete and accurate records of <br />costs, expenses, and time incurred for which Contractor will or may seek an adjustment. Contractor <br />waives and is stopped from seeking an adjustment of Contract Sum or Contract Time where Contractor <br />fails to keep and maintain cost, timekeeping, and scheduling records segregated and contemporaneously <br />allocated to the subject work for which an adjustment is sought. For example, failure to keep <br />contemporaneous labor and equipment time records specifically and only allocated to each item of <br />claimed Extra Work shall constitute a waiver of any Contract Claim for reimbursement or additional <br />Contract Time for each such item of Extra Work. The Contractor shall permit the Owner access to these <br />and any other records needed for evaluating requests for additional Contract Time or Contract Sum. <br />11. DIFFERING SITE CONDITIONS <br />Upon discovery and before such conditions are disturbed, the Contractor shall promptly provide Notice to <br />the City’s Representative of: <br />1. Pre-existing subsurface or latent physical conditions at the site differing materially from <br />those indicated in this Contract, or <br />2. Pre-existing unknown physical conditions at the site, of an unusual nature, differing <br />materially from those ordinarily encountered and generally recognized as inhering in <br />work of the character provided for in this Contract. <br />Upon written request, the City’s Representative shall determine whether the actual conditions <br />encountered by the Contractor conditions are materially different and, if so, are the cause of a material <br />increase or decrease in the Contractor’s cost of performance of the Work, or extend the duration of the <br />critical path of the schedule. Upon such determination, the City's Representative will make an adjustment
The URL can be used to link to this page
Your browser does not support the video tag.