City of Everett 01 25 00 - 2 <br /> <br /> <br />01 25 00 - 2 SUBSTITUTION PROCEDURES <br /> <br />1. LABELS: Locate required product labels and stamps on a concealed surface or, <br />where required for observation after installation, on an accessible surface that is <br />not conspicuous. <br />1.4 SUBMITTALS <br />A. PRODUCT LISTING SUBMITTAL: Submit three (3) copies of the product-listing <br />schedule within thirty (30) days after the date of commencement of the work. Provide a <br />written explanation for omissions of data, and for known variations from contract <br />requirements. At Contractor's option, initial submittal of the product-listing schedule may <br />be limited to product selections and product designations that must be established early <br />in the contract time. Submit completed product-listing schedule within sixty (60) days <br />after commencement of the work. <br />1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Deliver, store, and handle products in accordance with the manufacturer's <br />recommendations, using means and method that will prevent damage, deterioration and <br />loss, including theft. <br />B. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding <br />of construction spaces. <br />C. Coordinate delivery with installation time to ensure minimum holding time for items that <br />are flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other <br />losses. <br />D. Deliver products to the site in the manufacturer's original sealed container or other <br />packaging system, complete with labels and instruction for handling, storing, unpacking, <br />protecting and installing. <br />E. Inspect products upon delivery to ensure compliance with the contract documents, and <br />to ensure that products are undamaged and properly protected. <br />F. Store products at the site in a manner that will facilitate inspection and measurement of <br />quantity or counting of units. <br />G. Store heavy materials away from the project structure in a manner that will not endanger <br />the supporting construction. <br />H. Store products subject to damage by the elements above ground, under cover in a <br />weather-tight enclosure, with ventilation adequate to prevent condensation. Maintain <br />temperature and humidity within range required by manufacturer's instructions. <br />I. OFF-SITE STORAGE: If requested by the Contractor and approved in writing by the <br />Owner, the Owner may make payment to the Contractor for products stored off-site. <br />J. OWNER-FURNISHED MATERIALS: When materials or equipment furnished by the <br />Owner for installation by the Contractor are to be delivered and stored prior to installation,