My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 29 00 - 2 <br /> <br /> <br />01 29 00 - 2 PAYMENT PROCEDURES <br /> <br />C. Applications are to be signed by a responsible officer of the Contractor. Sign copies in <br />blue ink: photocopies of signature will not be accepted. <br />D. Application for payment shall include the following: <br />1. Approved form for Application for Payment. <br />2. Affidavit (Exhibit F) stating that all Subcontractors and materialmen have been paid <br />for work previously billed (do not submit with the first billing). <br />3. If authorized by the Owner, the Application for Payment may include request for <br />payment for material delivered to the project site and suitably stored, or for material <br />stored off-site provided the Contractor furnished Owner (a) a certificate of <br />insurance extending Contractor's insurance coverage for damage, fire, and theft <br />to cover the full value of all materials stored, or in transit; (b) Contractor furnishes <br />to Owner certified lists of materials stored, bills of lading, invoices, and other <br />information as may be required. <br />E. When Architect finds application properly completed and correct, it will sign and transmit <br />all copies of application for Payment to Owner for processing. <br />F. If Architect or Owner find an application improperly or incorrectly executed, an annotated <br />copy will be returned for New Submittal. <br />G. Only minor corrections are allowed on form with approval of Owner. <br />1.4 PROGRESS PAYMENTS AND PAYMENTS WITHHELD <br />A. Owner shall make progress payments as stipulated in the General Conditions, Article 7. <br />1.5 FINAL PAYMENT <br />A. Unless otherwise determined by the City, no application for final payment will be <br />accepted for processing until satisfactory completion of the following: <br />1. Contractor's Certificate of Payment of Debts & Claims. <br />2. Contractor's Certificate of Release of Liens. <br />3. Punchlist items complete and accepted. <br />4. Contract closeout document submittals received and accepted. <br />5. Final Change Orders signed off. <br />6. Affidavit of wages paid for general and all subcontractors and materialmen. <br />7. Subcontractor releases. <br />8. Required permits signed off. <br />9. Submittal of as-builts. <br />10. Submittal of O&M Manuals. <br />11. Other requirements as specified in Section 01 77 00 Project Closeout Procedures. <br />B. Provided that Contractor has completed or fulfilled all of its obligations under the <br />contract, Owner shall make final payment as provided in the Specification Section 00 72 <br />00 (General Conditions), Article 7. <br />PART 2 - PRODUCTS (Not Used)
The URL can be used to link to this page
Your browser does not support the video tag.