My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 29 73 - 2 <br /> <br /> <br />01 29 73 - 2 SCHEDULE OF VALUES <br /> <br />A. Maintain Schedule of Values as basis for supporting Application for Payment amounts <br />requested for each progress payment. <br />B. Correlate corresponding items listed by Schedule of Values line items with other <br />required administrative schedules and forms, including: <br />1. Contractor's Construction Progress Schedule. <br />2. Application for Payment forms, including Continuation Sheets. Correlate <br />Schedule of Values line items to that listed by Application for Payment: <br />a. Correspond to indirect costs and margins on actual cost. <br />b. Make amounts for total coast and overhead and profit complete and <br />proportionate. <br />c. Include overhead and profit as a single line item. <br />3. List of subcontractors. <br />4. List of principal suppliers and fabricators. <br />5. Schedule of submittals and list of products. <br />C. Use as basis for determining dollar value amount for each work activity and component <br />of work for duration of Project. <br />D. Make Scheduled of Values total sum equal to current Contract Sum. <br />E. Round-off figures to nearest dollar amount. <br />F. Identify Schedule of Value line items by corresponding Section Titles in Project Manual <br />Table of Contents. <br />G. Break down major portion of work by areas, disciplines, phase, systems, or as <br />appropriate for ease of review. <br />H. For work that exceeds 1 percent of Contract Sum, break out separate line items <br />according to major work activities, components, products, or operations. <br />1.6 CONTENT <br />A. Identification: Include the following Project identification on the Schedule of Values: <br />1. Project name and location. <br />2. Owner's name. <br />3. Name of the Architect / Engineer. <br />4. Project number. <br />5. Contractor's name and address. <br />6. Date of original submittal. <br />7. Date of revised submittals. <br />B. Work Activities: Indicate Cost Values for labor, material, equipment, and Contractor's <br />overhead and profit, and Total Cost Value for each line item.
The URL can be used to link to this page
Your browser does not support the video tag.