City of Everett 01 29 73 - 4 <br /> <br /> <br />01 29 73 - 4 SCHEDULE OF VALUES <br /> <br />F. Operation and Maintenance Manuals: Include line item of at least 1 percent of Contract <br />Sum for preparation, maintenance, and duplication. Upon completion, a portion of this <br />amount will be released based upon percentage of completion of the Work as a whole. <br />G. Commissioning: Include line item of at least 1 percent of Contract Sum for Section <br />23 08 00 - Heating Ventilating and Air Conditioning, for cooperation and coordination <br />with Commissioning Agent. <br />1. Commissioning Agent work includes systems documentation, start up, operation, <br />control system calibration and verification, performance testing, adjusting building <br />systems, and as required for completion of commissioning work of Section 01 91 <br />13. <br />2. Payment for of each line item of work will be made based upon percentage <br />completion of work and percentage of completion of commissioning work. <br />H. Punch List Work: Include line item of 1 percent of Contract Sum or itemize separately <br />by line item for each work activity. Payment of this 1 percent for each line item will be <br />authorized as each line item of work is complete and related testing and inspections <br />are satisfactorily completed. <br />1.7 LINE ITEM CATEGORIES <br />A. Arrange Schedule of Values in tabular form with separate columns. Break out following <br />for each work activity listing. <br />1. Section Number from Project Specifications Table of Contents <br />2. Description of Work. <br />3. Name of subcontractor. <br />4. Name of manufacturer or fabricator. <br />5. Name of supplier. <br />6. Scheduled Value for each Item of Work. <br />7. Pervious Work Complete, including Cost Value and Percent Complete. <br />8. Present Work Complete, including Cost Value and Percent Complete. <br />9. Change Orders (numbers) that affect value. <br />10. Total Billing, including Billing to Date, Percent of Contract Sum, and Balance to <br />Finish. Show dollar value as percentage of Contract Sum to nearest one- <br />hundredth percent, adjusted to total 100 percent. <br />11. Retainage. <br />12. Stored Material. <br />1.8 COST CATEGORIES <br />A. Assign following, making sum equal to total cost for each line item activity to show <br />initial costs of work activity and total installed cost. <br />1. Labor. <br />2. Equipment. <br />3. Material. <br />4. Subcontractor.