My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 45 00 - 1 <br /> <br /> <br />01 45 00 - 1 QUALITY CONTROL <br /> <br />SECTION 01 45 00 - QUALITY CONTROL <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This Section includes administrative and procedural requirements for quality assurance <br />and quality control. <br />B. Testing and inspecting services are required to verify compliance with requirements <br />specified or indicated. These services do not relieve Contractor of responsibility for <br />compliance with the Contract Document requirements. <br />1. Specified tests, inspections, and related actions do not limit Contractor's quality- <br />control procedures that facilitate compliance with the Contract Document <br />requirements. <br />2. Requirements for Contractor to provide quality-control services required by <br />Engineer, City, or authorities having jurisdiction are not limited by provisions of this <br />Section. <br />C. Contractor will pay for all proctor tests for all materials used for fill. <br />D. Owner will employ and pay for the services of an independent testing laboratory to <br />perform specified laboratory testing of materials: <br />1. In-place soil, gravels and import fill density testing. <br />2. In-place asphalt density testing. <br />3. Concrete slump, air content, and compression testing, excluding initial mix <br />designs. <br />4. In place masonry grout. <br />5. Anchor bolts and structural anchors. <br />1.2 DEFINITIONS <br />A. Quality-Assurance Services: Activities, actions, and procedures performed before and <br />during execution of the Work to guard against defects and deficiencies and ensure that <br />proposed construction complies with requirements. <br />B. Quality-Control Services: Tests, inspections, procedures, and related actions during and <br />after execution of the Work to evaluate that completed construction complies with <br />requirements. Services do not include contract enforcement activities performed by <br />Engineer. <br />C. Testing Agency: An entity engaged to perform specific tests, inspections, or both. <br />Testing laboratory shall mean the same as testing agency. <br />1.3 DELEGATED DESIGN
The URL can be used to link to this page
Your browser does not support the video tag.