My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 52 13 - 1 <br /> <br /> <br /> <br />00 52 13 - 1 AGREEMENT FORM <br />SECTION 00 5213 - AGREEMENT FORM <br /> <br />CONTRACT <br />THIS CONTRACT is made and entered into this _____ day of _____________, ____, by <br />and between the City of Everett, Washington, a municipal corporation existing under the <br />laws of the State of Washington (the “City”) and <br />______________________________________, (the “Contractor”). <br /> <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete <br />in a workmanlike manner the work, improvements, and appurtenances in accordance with <br />the Specifications and Drawings and all other Contract Documents entitled: “Police <br />Facilities Upgrades”, (the “Project”). <br />1. Contract Documents. The “Contract Documents” are defined in the General <br />Conditions. The Contract Documents are part of this Contract and are hereby <br />incorporated by reference. Terms that are capitalized in a Contract Document but not <br />defined in that Contract Document shall have the meaning defined to them in the other <br />Contract Documents. <br />2. Contract Time. Substantial Completion of the Work shall be achieved within One <br />Hundred Eighty Days (180) calendar days after the effective date of the Notice to <br />Proceed. Physical Completion shall be within Forty-Five (45) calendar days after the <br />actual date of issuance of Substantial Completion. <br />3. Liquidated Damages. The parties agree the City will suffer damage and be put <br />to additional expense in the event that the Contractor does not complete the Work in all <br />respects and have it ready for use by the Substantial and Physical Completion dates <br />stated above. Because it is difficult to accurately compute the amount of such costs <br />and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br />damages for each and every calendar day (or working day, if Contract Time is <br />described in working days) in the amounts set forth in this Section. For failure to <br />achieve Substantial Completion by the Substantial Completion date stated above, the <br />Contractor shall pay liquidated damages to the City computed at the daily rate of fifteen <br />percent (15%) of the Contract Sum divided by the number of days of Contract Time <br />stated above. Once Substantial Completion is achieved, for failure to achieve Physical <br />Completion by the Physical Completion Date stated above, the Contractor shall pay <br />liquidated damages at the daily rate of ten percent (10%) of the liquidated damages rate <br />applicable to delays to Substantial Completion. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.