Laserfiche WebLink
Element 3. Control flow rates: <br /> ❑ BMPC203:Water Bars <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C24I:Temporary Sediment Pond <br /> ❑ Other Per theSWMMWW: <br /> ® Not applicable to my proposed project <br /> Explain: Flow remaining same as it is today until project completed <br /> Element 4. Install sediment controls: <br /> ❑ BMPC23I: Brush Barrier <br /> ❑ BMP C232:Gravel Filter Berm <br /> ❑ BMP C233:Silt Fence <br /> 8 BMP C234:Vegetated Strip <br /> ❑ BMP C235:Wattles <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C24I:Temporary Sediment Pond <br /> ❑ Other Per theSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 5. Stabilize soils: <br /> ❑ BMP C 120:Temporary and Permanent Seeding <br /> ❑ BMP C 121:Mulching <br /> ❑ BMP C 122: Nets and Blankets <br /> ❑ BMP C 123: Plastic Covering <br /> ❑ BMP C 124:Sodding <br /> ❑ BMP C 125:Topsoiling/Composting <br /> ❑ BMP C 126:Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C 130:Surface Roughening <br /> ❑ BMP Cl3 I:Gradient Terraces <br /> ❑ Other Per theSWMMWW: <br /> ® Not applicable to my proposed project <br /> Explain: No slope-Verified by City of Everett-Attached <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-Apnl 2021 • <br />