Laserfiche WebLink
Element 9. Control pollutants: <br /> ❑ BMP C I5 1: Concrete Handling <br /> M BMP C 152: Sawcutting and Surfacing Pollution Prevention <br /> MI BMP C 153: Material Delivery, Storage,and Containment <br /> 8 BMP C 154:Concrete Washout Area <br /> ❑ BMP C250:Concrete Stormwater Chemical Treatment <br /> ❑ BMP C25 I:Construction Stormwater Filtration <br /> ❑ BMP C252: High pH Neutralization Using CO2 <br /> ❑ BMP C253: pH Control for High pH Water <br /> ❑ Other Per theSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 10. Control dewatering: <br /> ❑ BMP C236: Vegetative Filtration <br /> ❑ Other Per the SWMMWW: <br /> NI Not applicable to my proposed project <br /> Explain: No dewatering necessary for project <br /> Element 11. Maintain BMPs: <br /> 8 BMP C I50: Materials On Hand <br /> ❑ BM PC 160:Certified Erosion and Sediment Control Lead <br /> (CESCL not required on-site for<I acre). <br /> ❑ Other Per theSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 12. Manage the Project: <br /> MI BMP C 150: Materials On Hand <br /> ❑ BMPC I 60:Certified Erosion and SedimentControl Lead <br /> (CESCL not required on-site for sites<I acre) <br /> ❑ BMP C 162:Scheduling <br /> El Other Per theSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 <br />