My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 ROCKEFELLER AVE 2024-08-02
>
Address Records
>
ROCKEFELLER AVE
>
5306
>
5306 ROCKEFELLER AVE 2024-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2024 3:43:20 PM
Creation date
7/10/2024 10:54:48 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
5306
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2205-038 Description:SFR,NEW 24X24 DETACHED GARAGE/REMOVE CONCRETE <br /> PAD& <br /> Applied:5/10/2022 Approved: 1/27/2023 Site Address: 5306 ROCKEFELLER AVE <br /> Issued: 1/28/2023 Finaled:9/5/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:TARA RICHARDS <br /> Parent Permit: Owner: RICHARDS TARA&CROSBY DANIEL <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> ADD NEW 24X24 DETACHED GARAGE/REMOVE CONCRETE PAD AND <br /> REPLACE WITH GRAVEL PARKING/REMOVE COVERED GARDENING AREA AND REPLACE WITH GRAVEL PARKING**SEPARATE PW <br /> PERMIT REQ** <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 3/7/2023 3/7/2023 BLDG 02- RAKEEB KHAN PARTIAL see notes <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 3/3/2023 2:41 PM Tara Richards <br /> Contact Name:Tara Richards <br /> Site Address:5306 ROCKEFELLER AVE <br /> Phone:4253443413 <br /> e-Mail:courtneyrichards@allstate.com <br /> Mono pour footing. Holdowns to be wet set.Verify at shear inspection Do not pour.Need to inspect ufer <br /> Mono pour footing. Holdowns to be wet set.Verify at shear inspection Do not pour.Need to inspect ufer <br /> 3/7/2023 3/7/2023 BLDG 04-UFER RAKEEB KHAN CORRECTION <br /> GROUND REQUIRED <br /> Notes: <br /> Add ufer per NEC 250.50.Minimum 20 feet of#4 steel rebar <br /> 3/17/2023 3/17/2023 BLDG 02- RAKEEB KHAN APPROVAL <br /> FOOTING/SETBACK <br /> Notes: <br /> Mono pour footing. Holdowns to be wet set.Verify at shear inspection <br /> 3/17/2023 3/17/2023 BLDG 04-UFER RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> GROUND <br /> Notes: <br /> 3/14/2023 9:50 AM Tara Richards <br /> Contact Name:Tara Richards <br /> Site Address:5306 ROCKEFELLER AVE <br /> Phone:4253443413 <br /> e-Mail:courtneyrichards@allstate.com <br /> I <br /> Printed:Wednesday, 27 September, 2023 1 of 3 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.