My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/07/10 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/07/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 4:22:20 PM
Creation date
7/11/2024 10:32:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SUBCONSULTANTS <br />City of Everett: City of Everett Reservoir No. 3 Replacement - Amendment No. 1 <br />PSE 1-Alliance HWA <br />SUBCONSULTANTS <br />5.00% <br />1 <br />Task Total $0.00 $0.00 $8,274.00 $8,274.00 $413.70 $8,687.70 <br />2 <br />Task Total $0.00 $0.00 $2,995.00 $2,995.00 $149.75 $3,144.75 <br />3 <br />Task Total $4,800.00 $0.00 $15,781.00 $20,581.00 $1,029.05 $21,610.05 <br />4 <br />Task Total $0.00 $0.00 $88,631.00 $88,631.00 $4,431.55 $93,062.55 <br />9 <br />Task Total $35,670.00 $0.00 $18,844.00 $54,514.00 $2,725.70 $57,239.70 <br />Total Subconsultants 40,470.00$ -$ 134,525.00$ 174,995.00$ 8,749.75$ 183,744.75$ <br />Task 900 - Phase 1 Engineering Services During Construction Total SubconsultantsSub MarkupTotal Subconsultants + MarkupTask 100 - Project Management <br />Task 200 - Preliminary Design Report <br />Task 300 - Phase 1 Design Phase Services <br />Task 700.5 - Geotechnical (HWA GeoSciences) <br />Subconsultants Page 4 <br />EXHIBIT B1
The URL can be used to link to this page
Your browser does not support the video tag.