My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4034-24
>
Ordinances
>
Ordinance 4034-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 11:19:16 AM
Creation date
7/11/2024 10:54:45 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4034-24
Date
7/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EMC Title 15, Local Project Review Procedures Page 11 of 94 <br />The Everett Municipal Code is current through Ordinance 4031-24, passed May 22, 2024. <br />C. Any period during which an environmental impact statement is being prepared following a <br />SEPA determination of significance; <br />D. Any period during which the applicant has requested an interpretation of applicable <br />provisions of the city code and development regulations; <br />E. Any period for which a threshold determination requires further information from the <br />applicant and/or consultation with other agencies with jurisdiction, as determined by the <br />responsible official, in which case the running of the one-hundred-twenty-calendar-day period <br />shall be stayed until the required information and/or consultation is provided; <br />F. Any period for which a SEPA threshold determination requires further studies, including <br />field investigations initiated by the city; <br />G. Any time limits set forth in this section shall not apply to withdrawal of SEPA threshold <br />determinations (DS, DNS) where such withdrawals are made in accordance with WAC <br />197-11-340 and 197-11-360; <br />H. Any period for administrative appeals of project permits or SEPA determinations; and <br />I. Any extension of time mutually agreed upon by the applicant and the city. (Ord. 3774-20 § 3 <br />(Exh. 2), 2020.) <br />15.01.100 Exceptions. <br />The time limit requiring a final decision within one hundred twenty days of the notice of <br />application on a Review Process II or III decision does not apply if the land use permit <br />application: <br />A. Requires an amendment to the comprehensive plan or a development regulation; <br />B. Requires approval of a new fully contained community as provided in RCW 36.70A.360, or <br />the siting of an essential public facility as provided in RCW 36.70A.200; <br />C. Is substantially revised by the applicant, in which case the new one-hundred-twenty-day <br />time period shall start from the date at which the revised project application is determined to <br />be complete; or
The URL can be used to link to this page
Your browser does not support the video tag.