Laserfiche WebLink
EMC Title 15, Local Project Review Procedures Page 21 of 94 <br />The Everett Municipal Code is current through Ordinance 4031-24, passed May 22, 2024. <br />4. The review process for land use decisions shall be REV I unless otherwise indicated in <br />this title, or as otherwise determined by the planning director based on subsection (B)(5) of <br />this section. <br />5. Administrative determinations made by the planning department staff that are not <br />associated with an application specifically identified in the unified development code and <br />that are categorically exempt under SEPA are not subject to the procedures and <br />requirements of this title. <br />6. If the planning director determines that notice to contiguous property owners should <br />be provided regarding a land use decision, the planning director may require the permit <br />application to be reviewed using a higher level of review process than otherwise required. <br />C. Action Taken. Action taken on the application shall be one of the following: <br />1. Permit issuance or approval, which may include conditions on the project; <br />2. Permit denial explaining the reasons the permit was not approved; or <br />3. A letter explaining what additional information is necessary or other approvals which <br />are required before the permit can be issued. <br />An administrative appeal to the hearing examiner is provided. Any appeals shall be in <br />accordance with the appeals section of this chapter (see EMC 15.02.600). <br />D. Public Notice Requirements. <br />1. No public notice is required for REV I land use decisions except for shoreline permit <br />applications as set forth in subsection (D)(5) of this section. <br />2. When a project requires more than one land use permit, public notice shall follow the <br />public notice requirements for the highest review process. <br />3. The city provides a notice of application, which is a public record. These records are <br />available upon request and may be available electronically through the city’s open data <br />portal or other web-based applications. <br />4. Historic. Those REV I actions that are subject to review by the historical commission shall <br />follow procedures for public notice and conduct of public meetings.