My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4034-24
>
Ordinances
>
Ordinance 4034-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 11:19:16 AM
Creation date
7/11/2024 10:54:45 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4034-24
Date
7/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EMC Title 15, Local Project Review Procedures Page 28 of 94 <br />The Everett Municipal Code is current through Ordinance 4031-24, passed May 22, 2024. <br />a. Where a time limit on the land use permit is otherwise established under federal or <br />state law, or city ordinance; <br />b. Where a development agreement has been executed (see Section 15.03.200); or <br />c. Where the permittee requests an extension in writing not later than three years <br />from the land use permit date, the planning director may grant a six-month extension. <br />2. Land Division Approvals. See Section 15.02.400 for expiration of land division approvals. <br />(Ord. 3895-22 §§ 1, 2, 2022; Ord. 3774-20 § 3 (Exh. 2), 2020.) <br />15.02.080 Review Process III: hearing examiner review. <br />A. Description. Review Process III is a discretionary review process in which the land use <br />hearing examiner may approve, approve with conditions, modify, or disapprove an application <br />based upon the requirements of the city’s comprehensive plan, land use regulations, other <br />applicable city ordinances or regulations, or any other applicable regulations administered by <br />federal, state, regional, local, or other agencies. Specific criteria may apply to certain listed <br />Review Process III applications. <br />B. REV IIIA and REV IIIB Decisions Included. There are two types of REV III review processes: <br />1. Rev IIIA. These are actions for which the hearing examiner issues a final decision on the <br />application after an open public hearing. <br />a. Uses. <br />(1) Land use decisions identified as “Conditional Uses” or “C” in Sections 19.05.080 <br />through 19.05.120, Tables 5-1 through 5-5. <br />(2) Industrial Zones Along the Waterfront. Requests for additional heights to <br />accommodate industrial activities with access to the marine shorelines or <br />Snohomish River in Section 19.22.070. <br />b. Nonconforming. Expansion of a nonconforming use greater than twenty-five percent <br />of land or building area (Chapter 19.38).
The URL can be used to link to this page
Your browser does not support the video tag.