My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4034-24
>
Ordinances
>
Ordinance 4034-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 11:19:16 AM
Creation date
7/11/2024 10:54:45 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4034-24
Date
7/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EMC Title 15, Local Project Review Procedures Page 39 of 94 <br />The Everett Municipal Code is current through Ordinance 4031-24, passed May 22, 2024. <br />comment period shall commence on the date that the site is posted or notices published or <br />mailed, whichever occurs later. Other than commenting on the notice of application, any <br />other comment periods should be specified in the public notice inviting comments. <br />3. Exceptions. <br />a. Land Divisions. <br />(1) Comments on Review Process II preliminary subdivision, or subdivisions and <br />short subdivision alteration or vacation applications shall be submitted within <br />twenty days of the issuance of the notice of application. <br />(2) A copy of all written comments on Review Process II land divisions shall be <br />provided to the applicant, and the applicant will have seven days from the receipt <br />of the comments to respond to the city. <br />b. Shoreline Permits. Comments on shoreline substantial development, conditional use <br />or variance permit applications shall be submitted within thirty days of the issuance of <br />the notice of application, except that comments shall be submitted within twenty days <br />for shoreline permits for limited utility extensions or for the construction of a bulkhead <br />or other measures to protect a single-family residence and its appurtenant structures <br />from shoreline erosion. See the definitions section of the city’s shoreline master <br />program for the definition of a limited utility extension. <br />4. “Submitted” means “physically or electronically received by the city.” Notice: the city <br />does not assume any responsibility for failure to receive comments received electronically. <br />A sender should seek confirmation that the city received the comments to satisfy the <br />timing required for submission of comments. (Ord. 3774-20 § 3 (Exh. 2), 2020.) <br />15.02.120 SEPA procedures. <br />A. Timing and Integration of SEPA. <br />1. The primary purpose of the environmental review process is to provide environmental <br />information to governmental decisionmakers to be considered prior to making their <br />decision, and to provide for appropriate mitigation of environmental impacts in compliance
The URL can be used to link to this page
Your browser does not support the video tag.