Laserfiche WebLink
Chapter 19.01 EMC, Introduction to Unified Development Code Page 7 of 8 <br />The Everett Municipal Code is current through Ordinance 4031-24, passed May 22, 2024. <br />projects are minor in nature and do not require a land use permit. These projects must obtain <br />construction permits, which are reviewed by the planning department for compliance with the <br />standards in this title. <br />B. Land Use Permits. A land use application may be required for larger projects, for projects <br />involving a modification of development standards or for projects involving special uses or <br />activities. A land use application generally must be completed prior to submittal of an <br />application for construction permits. Land use permits typically fall under Review Process I, II or <br />III. Refer to EMC Title 15 to determine the review process for the different types of land use <br />applications. In addition, some larger projects may require a review under SEPA as set forth in <br />Chapter 19.43 EMC. Figure 1-2 below illustrates how a land use permit is processed using <br />Review Process II. <br />Figure 1-2: Typical Review Process II Flowchart <br /> <br />* The preapplication meeting may be waived by the planning director. <br />** Any appeals of the hearing examiner decision are to superior court. <br />(Ord. 3774-20 § 5(A) (Exh. 3), 2020.)