Laserfiche WebLink
C <br />CC <br />CCMVAN <br />C <br />CC C M <br />CCM <br />14TH ST14TH STBAKER AVE12TH STSW 1 <br />SW 2 <br /> SW 3 <br />SE 1 SE 2 <br />SE 3SE 4 <br />NE 1 <br />NE 2 <br />NW 3 <br />NW 2 <br />NW 1 <br />TH 3 <br />TH 2TH 1 12TH STPINE ST FIR ST <br />POPLAR ST <br />HEMLOCK ST <br />15TH STNEW ST.100'-0"50'-0"25'-0"0 <br />PREPARED BY: <br />REVISIONS: <br />SCALE: <br />DEVELOPMENT PLAN FOR PDO/ EIS SUBMITTALS <br /> 1" = 50'-0" <br />SITE PLAN B/W <br />AUGUST 15, 2023 <br />Exhibit C.2.1aa <br />GGLO <br />Phase 1 Development <br />Phase 1 Infrastructure <br />Phase 1 Infrastructure <br />Interim Phase 2 Infrastructure <br />Final Phase 3 Infrastructure <br />Phase 2 Infrastructure <br />Phase 2 Development <br />Phase 3 Development <br />Phase 4 Development <br />Phase 3B <br />Phase 4B <br />Phase 3A <br />Phase 4A <br />Interim Phase 2 Infrastructure <br />Final Phase 3 Infrastructure <br />Interim Phase 2 Infrastructure <br />Final Phase 4 Infrastructure <br />Variable Development Phasing <br />Variable Development Phasing <br />Phase 1 Open Space Improvements Phase 2 Open Space Improvements <br />Phases <br /> 2/4* <br />PHASING DIAGRAM <br /> EIS AND PRELIMINARY DEVELOPMENT PLAN <br />August 22, 2023FRAMEWORK <br />Pine Street <br />Phase 2: Interim park area landscaping <br />Phase 4: Final park area landscaping <br />* <br />PHASING CONCEPT DIAGRAM <br />EXHIBIT C.6.1 <br /> VERSION AUGUST 22, 2023 <br />Preliminary Development Plan for PDO Application <br />NOTE: REFER TO THE SITE PLAN (EXHIBIT C.2.1) FOR BUILDING <br />FOOTPRINTS, BUILDING LOCATIONS, STREET, AND CURB <br />ALIGNMENTS. REFER TO THE LANDSCAPE PLAN (EXHIBIT C.4.1) <br />FOR LANDSCAPE LOCATIONS AND CONCEPTS.