Laserfiche WebLink
CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ #2024-004 Service Center 3 Reroof <br />Description of Change: <br />BUILDING/LOCATION: 3200 Cedar Street, Building #3, Everett, WA 98201 <br />This change order extends the completion date by forty-five (45) days. <br />When the contractor ordered the specified materials in the solicitation, the roofing system manufacturer <br />informed the contractor and the city that the intended application process of the roof could potentially <br />void the 20-year manufacturer's warranty. The manufacturer considered the application requested by <br />the city to be non-standard. The city was unaware that the specified application process would void the <br />20-year warranty. <br />For the manufacturer to consider honoring the 20-year warranty, the contractor must request the <br />manufacturer approve a variance. This variance request must include test results verifying that the <br />specified application process. The contractor could not begin the <br />testing process until May 1, 2024. <br />After testing was completed, the results indicated that the specified process was incompatible with the <br />roofing material, risking the warranty coverage. The city chose to proceed with the manufacturer- <br />recommended application, ensuring the project would be done effectively and receive a 20-year <br />warranty. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change $57,367.80 Contract Time & Completion Date Prior <br />to This Change 90 <br />Completion <br />Date Prior <br />6/17/24 <br />* Net (Increase) or (Decrease) Resulting <br />from this Change+$0 Net (Increase) or (Decrease) Resulting <br />from this Change 45 <br />* Total Project Price, Including this Change $57,367.80 Contract Time & Completion Date <br />Including This Change 135 <br />Completion <br />Date After <br />8/1/24 <br />By signing below, the City of Everett and the Contractor agree that the Contract work shall be changed to the extent described <br />in all such <br />changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree that Contract <br />time shall be adjusted to the extent shown above. This Change Order only changes the contract between the City of Everett <br />and the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order may be ink, scanned <br />pdf signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />Washington Roofing Solutions LLC <br />PO Box 64869 <br />Tacoma, WA 98464 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager:Doug Acheson <br />Division Manager:Russell Dance <br />Department Director:Bob Leonard <br />0001 <br />Melissa Gustafson