Laserfiche WebLink
City of Everett - Everett Transit <br />Inductive Charging Field Installation for Eclipse Mill Park Zach Gray Dawn Li Michael Vu Samantha Pier <br />Civil - Additional Construction Administration Services - July 3, 2024 <br /> Project <br />Manager <br /> Design <br />Engineer CAD Tech Project <br />Coordinator <br />Billing Rate (2024)260.65$ 123.75$ 135.54$ 114.39$ <br />Task #Scope of Services <br />1 Construction Administration <br />1.1 Construction Meetings 4 4 2 10 <br />1.2 Requests for Information (RFIs)2 6 2 10 <br />1.3 Submittals 1 4 5 <br />1.4 Change Orders 1 2 3 <br />1.5 Site Visits 6 6 12 <br />1.6 Final Punchlist 4 4 8 <br />1.7 Record Drawings 1 4 6 11 <br />1.8 Operations and Maintenance Manual 2 4 6 <br />Task 1 Total Hours 21 34 8 2 65 <br />Task 1 Cost by Staff 5,473.65$ 4,207.50$ 1,084.32$ 228.78$ 10,994.25$ <br />Total Budget (Not to Exceed) 10,994.25$ <br />Total <br />Hours