My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
915 N BROADWAY 2024-07-22
>
Address Records
>
N BROADWAY
>
915
>
915 N BROADWAY 2024-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2024 9:46:01 AM
Creation date
7/19/2024 9:51:04 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
915
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br /> TO <br /> COVENANT <br /> MAINTENANCE PROCEDURES <br /> Catch basins adjacent to work area will have inserts installed for the duration of the <br /> project, which will be removed when the project is complete. Catch basin inserts will be <br /> installed prior to clearing and grading activity, or upon placement of a new catch basin. <br /> Sediment shall be removed from the unit when it becomes one-third full or in accordance <br /> with the manufacturer's instructions. Sediment removal shall be accomplished by <br /> removing the inlet inserts, emptying and re-inserting it into the catch basin. Sediment <br /> shall not be washed into storm drains while cleaning. <br /> Straw wattles shall be installed on the site as indicated in the drawing C2. Sediment will <br /> be removed from the up slope side of the compost silt sock when accumulation has <br /> reached 1/2 of the effective height of the sock. Straw wattles will be removed at the end <br /> of the project. <br /> Covenant for Inspection and Maintenance of Exhibit C <br /> On-Site Stormwater Management BMPs <br />
The URL can be used to link to this page
Your browser does not support the video tag.