Laserfiche WebLink
STEP 1. DETERMINE APPLICABILITY <br /> Use the criteria below to determine if this template may be used for your project. If any <br /> criteria below are marked "False,"this template may not be used and a report <br /> meeting City standards is required and shall be prepared by a professional <br /> Engineer licensed in the State of Washington. Flow control facilities shall be <br /> designed by an engineer for projects with 2,000 sf or more net new impervious area (see <br /> Ste 5 . <br /> 0 ❑ This project drains to the combined sewer. <br /> 0 ❑ This project will create at least 200 sf of net new impervious area. (See Item <br /> "F " in Step 2) <br /> 0 ❑ This project will create less than 5,000 ftz of added plus replaced impervious <br /> surface area (Item C + Item D in Step 2). <br /> 0 ❑ This project converts less than 1/4 acre of native vegetation, pasture, <br /> scrub/shrub or unmaintained non-native vegetation to lawn or landscape <br /> areas. <br /> This project will not adversely impact a water of the state. <br /> x❑ ❑ This project will not change a natural drainage course and will not generate any <br /> new concentrated flows leaving the site. <br /> 0 ❑ This project will not be constructed within a critical area or a critical area buffer <br /> and will not adversely impact a critical area.See the City of Everett Municipal <br /> Code, Title 19.37. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 5 <br /> the Combined Sewer Area-September 2022 <br />