Laserfiche WebLink
pNs <br /> 0 <br /> DONE! <br /> You have now completed the Small Project Stormwater Report for the Combined <br /> System. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added: <br /> ❑ Project Specific Stormwater Site Plan [This packet and drawings] <br /> ❑ Topographic Survey [if applicable] <br /> ❑ Declaration of Covenant <br /> ❑ Construction TESC Drawings <br /> ❑ Underground Injection Well(UIC)Registration* [if applicable] <br /> *You mayneed to register with the Washington State Department of Ecologyat least 60 <br /> days prior to commencing UIC Construction.For more information, visit: <br /> e verettwa.gov/1985/Storm water-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 19 <br /> the Combined Sewer Area-September 2022 <br />