My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4819 ALGER AVE 2024-07-22
>
Address Records
>
ALGER AVE
>
4819
>
4819 ALGER AVE 2024-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2024 9:46:41 AM
Creation date
7/19/2024 9:54:33 AM
Metadata
Fields
Template:
Address Document
Street Name
ALGER AVE
Street Number
4819
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETE IF .USING INFILTRATION(2A or 2B) TO MEET tFL-OW <br /> CONTROL REQUIREMENT <br /> Determine whether infiltration has been pre-determined to be infeasible for any portion of your <br /> project site. <br /> Review <br /> view the infiltration infeasibility mapping tool available on"Map Evereff <br /> everettwa.gov/mapeverett. <br /> ■ On the mappingtool,select"Geotechnical/Infiltration Infeasibility Area"and the <br /> applicable"Property"layers from the Layer List. <br /> ■ Zoom into your projectsiteand printtheresulting map toshowtheprojectsite <br /> boundaries and the infiltration infeasibility mapping results. <br /> ■ Areas mapped as red have been pre-determined to be infeasible for infiltration. <br /> ■ Areas.mapped as green are potentially feasible for infiltration and must be <br /> assessed further for infiltration feasibility,as discussed further below. <br /> ■ Attach a printed copy of the map clearly showing your project site boundary and the <br /> infiltration infeasibility mapping results. <br /> * If you selected Downspout Full Infiltration (2A); submit I and 2 below. <br /> If you selected Rain.Garden/Bioretention (2B), on-site soils information for sizing is <br /> required from I through 3 below. <br /> Submit the following information to Permit Services with this report: <br /> I. A USDA Custom Skil Report from https://websoilsurvgy.sc.egov.usda.gov <br /> 2. USDA Soil Type(s) <br /> 3. Measured Infiltration Rate= in/hr, measured at BMP location on-site. Use Rain Garden <br /> Handbook methodology for infiltration test. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 16 <br /> the Combined Sewer Area-September 2022 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.