Laserfiche WebLink
i <br /> i <br /> STEP 1. DETERMINE APPLICABILITY <br /> 0 Use the criteria below to determine if this template may be used for your project. If any <br /> trite fia below are marked"False,"this template may not be used and a report <br /> meeting City standards is required and shall be prepared by a professional <br /> Engineer licensed in the State of Washington. Flow control facilities shall be <br /> designed b_y an engineer for projects with 2,000 sf or more net new impervious area(see <br /> Ste 5 . <br /> ❑ This project drains to the combined sewer': . . <br /> ❑ This projectwill create at least 200 sf of net new impervious area..(See Item .' _ <br /> «T„ in Step 2) <br /> ❑ [ I This project will create less-than 5,000 ft2 of added plus replacedimpervious <br /> surface area (Item C +•Item bAn Step-2): <br /> ❑ This project converts less than' 1/4 acre of native vegetation;.pasture, <br /> scrub/shrub or unmai'ntained non native vegetation to lawn or landscape <br /> areas. <br /> This project will,not adversely.impact a water of the-'state;' <br /> ❑ This project will not change a natural drainage,course and will not generate any <br /> new concentrated flows'leaving.the site. <br /> ❑ <br /> This"project'wi11 not lie constructed with in.a critical area or a criticafarea buffer, <br /> and will not adversely impact a critical area.See the City of Everett Municipal <br /> Code;Title 19.37. ; <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 5 <br /> the Combined Sewer Area-September 2022 <br />