My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 SHUKSAN WAY 2024-07-22
>
Address Records
>
SHUKSAN WAY
>
215
>
215 SHUKSAN WAY 2024-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2024 3:29:19 PM
Creation date
7/19/2024 10:45:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U2401 -035 <br /> - PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> E V E R E T T 425-257-8800 <br /> WASHINGTON <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $11700.00 Service Order# <br /> Requested By: COE Permit Services <br /> Contact Person William Townley Telephone# 1 619 772-0224 <br /> Email Address: ksllultis(j�seagen.com Date of Request 12-4-2023 <br /> Property Owner(name) DPIF2 WA 7 MOUNTAIN VIEW, LLC <br /> Charge Cost to(name if different than owner) Attn: Keith Shultis <br /> Address 11900 NE 1St STE 300 City Bellevue, WA zip 98005 <br /> Installation Location 215 Shuksan Way Bldg B <br /> Installation type/description/size/etc. Install new 6" meter. Install new 6" compound meter in <br /> contractor installed piped through vault. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Signed Cost Estimate sheet must be sent to PermitServices@EverettWA.gov to move forward. <br /> *Permit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS V AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> TOTAL: $11700.00 <br /> cc: PermitServices@EverettWA.gov,Shaun Bridge-Email,Jim Spooner-HC,Sabrina Good-Email, <br /> Grant Moen-Email,Terri Jorgenson-Email,Thad Newport-Email,Lindsay Moo-Email,Jim Knappert-Email <br /> Prepared by: Jim Spooner Date Estimate Prepared 12-12-2023 <br /> Accepted by: Representing Pfizer(formerly Seagen) <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\Nov2023\215 Shuksan 6 inch dom CEFP <br /> Iof1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.