My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3202 COLBY AVE 2024-07-22
>
Address Records
>
COLBY AVE
>
3202
>
3202 COLBY AVE 2024-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 10:50:57 AM
Creation date
7/19/2024 10:50:29 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BETHANY <br /> SIGNAGE SCHEDULE <br /> FASTS/GNS <br /> E V E R E T T <br /> TENNANT: BETHANY NW <br /> ADDRESS: 3202 Colby <br /> 32n ZONE: UR4 (in Metro) SIGN CATEGORY: A <br /> PARCEL: 00439176802500 BETHANY NW <br /> OWNER: BETHANY OF THE NORTHWEST <br /> SCOPE : <br /> • WALL SIGN, <br /> NON-ILLUMINATED. <br /> PROPOSED SIGNAGE: <br /> PR03ECT: <br /> ALUMINUM COMPOSITE WALL SIGN, SIGN PERMIT <br /> WITH PRINTED VINYL GRAPHICS. VERSION: <br /> NON-ILLUMINATED. <br /> DATE : , <br /> PROJECT MANAGER: <br /> DANIEL ALBERT <br /> 0 <br /> U <br /> ENGINEER : <br /> DUANE STEIG <br /> SUBMITTAL REVISIONS <br /> APPROVAL <br /> BY <br /> DATE <br /> AS SHOWN <br /> WITH REVISIONS AS NOTED <br /> N <br /> SITE PLAN VIEW - PARCEL MAP <br /> O � <br /> At FASTSIGNS,we take pride in precision,but the final examination for accuracy is your responsibility. Before giving approval, please examine all proofs carefully for the accuracy of information presented,as well as spelling,punctuation, <br /> numbers,graphics,colors,room numbers,install locations and general layout. In the event that we have miscommunicated regarding your original design,we will be happy to provide a second proof free of charge if needed. If further Page 2 of 4 <br /> revisions are required after approval has been received,additional charges will be incurred.Our normal production cycle will begin from the date approval is received.We cannot accept changes or approvals verbally. <br />
The URL can be used to link to this page
Your browser does not support the video tag.