Laserfiche WebLink
BETHANY NW WALL a- MOMWE Mj SIGN DETAILS 1 CONNECTIONS <br /> FFASTS/GNS <br /> FRONT VIEW IM <br /> SCALE: 1:1 E V E R E T T <br /> 133.0" <br /> 66.5" Panel One 3 M M A C M 66.5" Panel Two 3 M M A C M <br /> - ' ORDER # 96601 <br /> CLIENT: <br /> BETHANY NW <br /> SCOPE : <br /> mT ■ • WALL SIGN, <br /> ° NON-ILLUMINATED. <br /> ECT: <br /> SIGN <br /> SIGN PERMIT <br /> VERSION: <br /> 112"THICK ACRYLIC DIMENSIONAL LETTERING. Loco HAS BEEN PURPOSE STRETCHED TO FILL ENTIRE BACKER 3116^DIA HOLES 1 <br /> ATTACHED TO BACKER PANEL WITH VHB TAPE AND ADHESIVE AT CLIENT'S REQUEST APPROX EVERY 24^ <br /> FOR MOUNTING WITH <br /> SCREWS TO FACIA FACADE <br /> DATE 3/27/2024 <br /> SIGN DETAILS: 3MM ALUMINUM COMPOSITE MATERIAL (ACM) Panels, WITH 1/2" THICK ACRYLIC LETTERS <br /> U 133" X 24.5" = 3,258.5 SQ. IN. / 144 = 22.6 SQ. FT. Scale: NOT OT SCALE WOOD FACADE <br /> PROJECT MANAGER: <br /> FACIA DANIEL ALBERT <br /> ENGINEER : <br /> DUANE STEIG <br /> SUBMITTAL REVISIONS <br /> 1/2"THICK ACRYLIC <br /> DIMENSIONAL LETTERING. <br /> ATTACHED TO BACKER PANEL <br /> WITH VHB TAPE AND ADHESIVE. <br /> ACM SIGN PANELS: <br /> TWO(2)SIDE BY SIDE APPROVAL <br /> WIDTH WISE <br /> BY <br /> ATTACH WIT DATE <br /> Truss head screws:#12 x 1.5"long, AS SHOWN <br /> Covered with small white vinyl dots. WITH REVISIONS AS NOTED <br /> APPROX.EVERY 24"TOP AND BOTTOM <br /> 02 ATTACHMENT DETAIL/Typical Section <br /> Scale: <br /> NOT OT SCALE <br /> At FASTSIGNS,we take pride in precision,but the final examination for accuracy is your responsibility. Before giving approval,please examine all proofs carefully for the accuracy of information presented,as well as spelling,punctuation, <br /> numbers,graphics,colors,room numbers,install locations and general layout. In the event that we have miscommunicated regarding your original design,we will be happy to provide a second proof free of charge if needed. If further Page 4 Of 4 <br /> revisions are required after approval has been received,additional charges will be incurred.Our normal production cycle will begin from the date approval is received.We cannot accept changes or approvals verbally. <br />