Laserfiche WebLink
D C I <br /> E n G I n E E R S <br /> memorandum <br /> DATE: March 1,2024 JOB#: 24011-0076 <br /> TO: Jim Sutterfield <br /> CC: Taylor Herman <br /> FROM: Craig Stainer <br /> SUBJECT: Proposed Woods Coffee <br /> Drive Thru Menu Board Foundations <br /> DCI Engineers has reviewed the existing footings at the drive-thru for the proposed new Woods <br /> Coffee to be located at 11804 Hwy. 99 in Everett WA. <br /> These existing footings were used by the previous tenant for a similar purpose. <br /> The existing footings are proposed to be used to support three new menu boards identified as <br /> ST9,ST10 and ST11. <br /> Existing structural drawings were available for review that showed the footing sizes and <br /> reinforcing. DCI Engineers used this information to check the existing footings for loading from the <br /> proposed new menu boards. <br /> Based on our review,the existing footings are adequate to support the three menu boards <br /> identified above. <br /> Anchorage for the new menu boards to the existing footings must use post-installed anchors.The <br /> required anchors and configuration are shown in SSK-01,attached. <br /> Please contact this office for any questions concerning this matter. <br /> L f9 <br /> 1F <br /> 47670 <br /> G <br /> Washington I Oregon I Idaho I California I Texas I Alaska I Colorado I Montana I Delaware I Pennsylvania <br />