My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5218 S 2ND AVE 2025-04-21
>
Address Records
>
S 2ND AVE
>
5218
>
5218 S 2ND AVE 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 7:24:47 AM
Creation date
7/19/2024 11:36:27 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5218
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FASTS/GNS <br />SITF PI AN / PAR[_FI MAP <br />PROPERTY INFO: <br />Parcel ID: 00500301800500 <br />Property Address: 5216 S 2ND AVE <br />City: EVERETT <br />Zip Code: 98203 <br />Taxpayer: LOWELL COMMUNITY CHURCH <br />Owner: LOWELL COMMUNITY CHURCH <br />ZONE B, SIGN CATEGORY A <br />SIGN ALLOWANCE: <br />Greater of 32 s.f. or 15% of the area of the building facade up to a maximum of 100 s.f. <br />N PROPOSED SIGNS: 8' X 4' = 32 SQ. FT. EACH <br />E V E R E T T <br />CLIENT: <br />LOWELL COMMUNITY <br />CHURCH <br />FILE NAME: <br />60711 <br />PR03ECT: <br />2 Wall Signs <br />VERSION: <br />1 <br />PROJECT MANAGER: <br />Duane Steig <br />ENGINEER: <br />Duane Steig <br />BY <br />DATE <br />AS SHOWN <br />WITH REVISIONS AS NOTED <br />At FASTSIGNS, we take pride in precision, but the final examination for accuracy is your responsibility. Before giving approval, please examine all proofs carefully for the accuracy of information presented, as well as spelling, punctuation, <br />numbers, graphics, colors, room numbers, install locations and general layout. In the event that we have miscommunicated regarding your original design, we will be happy to provide a second proof free of charge if needed. If further <br />revisions are required after approval has been received, additional charges will be incurred. Our normal production cycle will begin from the date approval is received. We cannot accept changes or approvals verbally. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.