Laserfiche WebLink
Page 2 of 2 <br />MMIML <br />VA �M&Associates, Inc. <br />Geotechnical Engineering . Environmental Engineering <br />Construction Testing and Inspection <br />n <br />Field <br />Report NO.:09621171632021JA <br />—4.1.y yy_ - J1, <br />Note: l <br />I. Contractor inform us they will put the #6 at the center after the cage is set-up on the pile. Need to <br />inspect prior placement of concrete. <br />Reviewed <br />� 3/L� ASTM Test M <br />Asset <br />To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and <br />regulatory requirements. <br />Technician: <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client. Ibis report may not be reproduced in any fonnat without the written permission of the client and Kmran & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />