My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6307 36TH AVE W 2024-08-07
>
Address Records
>
36TH AVE W
>
6307
>
6307 36TH AVE W 2024-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 2:31:19 PM
Creation date
7/19/2024 2:03:51 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6307
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Dry Pipe Systems - In addition to the standard hydrostatic test, an air pressure ❑ ❑ ❑ <br />leakage test at 40 psi shall be conducted for 24 hours. Any leakage that results in a <br />loss of pressure in excess of 1 % psi for the 24 hours shall be corrected. This test <br />will have to be scheduled for a different day to allow for the 24 hours test. <br />Additions or Modifications: <br />PASS FAIL N/A <br />7. 20 or Fewer Heads - Additions or Modifications affecting 20 or fewer sprinklers ❑ ❑ ❑ <br />shall not require testing in excess of system working pressure. <br />8. More Than 20 Heads - Additions or Modifications affecting more than 20 ❑ ❑ ❑ <br />sprinklers, the new portions shall be isolated and tested at not less than 200 psi <br />for 2 hours. (Additions or Modifications that cannot be isolated, such as relocated <br />drops, shall not require testing in excess or system working pressure. <br />9. Work Affecting FDC - Repairs or replacements or work affecting the FDC, piping <br />between the exterior and the check valve in the fire department inlet pipe shall be <br />isolated and hydrostatically tested at 150 psi. <br />Step 4: Sprinkler Final <br />PASS FAIL N/A <br />1. Scheduling - The contractor shall schedule for the inspection using eTRAKiT online ❑ ❑ ❑ <br />permitting portal. Inspection requests submitted online before 11:59 p.m. on <br />Monday -Friday will be tentatively scheduled for the next business day. <br />2. Fire Alarm - Acceptance testing for the above ground portions of the sprinkler ❑ ❑ ❑ <br />system will not be conducted unless the fire alarm system is fully operational and <br />is ready for acceptance testing at the same time as the sprinkler system. All <br />sprinkler devices shall be tested with both the sprinkler and fire alarm contractors <br />present. <br />3. Approved Plans - Approved/Stamped set of plans. ❑ ❑ ❑ <br />4. Waterflow Test - Test waterflow alarm by flowing water from the Inspectors Test ❑ ❑ ❑ <br />Valve. The alarm should sound no earlier than 20 seconds and no later than 90 <br />seconds. (Wet and dry systems) <br />5. Access Panels - A minimum 12" x 36" access panels shall be provided for all valves ❑ ❑ ❑ <br />located inside a wall or concealed space. Signage shall be provided on the outside <br />of access panel indicating type of valve that is concealed within. <br />6. Exterior Horn/Strobe - Verify that a listed horn/strobe device is located on the ❑ ❑ ❑ <br />front exterior of the building in an approved location in close proximity to the <br />buildings address. Such device shall be activated by water flow actuation of the <br />automatic sprinkler system. <br />Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 4.13.2020 1 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.