Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />BLDG 05- <br />10/27/2023 <br />10/27/2023 <br />UNDERFLOOR <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />FRAMING <br />REQUIRED <br />Notes: <br />10/26/2023 10:49 AM Perry Kethlaor <br />Floor joist <br />Contact Name: Perry Kethlaor <br />Site Address: 1711 125TH PL SE <br />Phone:4253437376 <br />e-Mail: pkethlaor@gmail.com <br />Missing vapor barrier and insulation. Note plans call for 2x10 but not enough depth to install. Current floor framing is bearing on the ground. <br />Reschedule inspection when vapor barrier and insulation is installed. Lap vapor barrier as specified on the plans. <br />BLDG 05 <br />11/3/2023 <br />11/3/2023 <br />UNDERFLOOR <br />RAKEEB KHAN <br />FAPPROVAL <br />eTRAKiT Inspection Request <br />FRAMING <br />Notes: <br />11/1/2023 1:21 PM Perry Kethlaor <br />Floor joist <br />Contact Name: Perry Kethlaor <br />Site Address: 1711 125TH PL SE <br />Phone:4253437376 <br />e-Mail: pkethlaor@gmail.com <br />Floor framing is bearing on the sleepers on the ground. Not enough depth to install 2x10's per plan. Floor framing ok. <br />11/3/2023 <br />11/3/2023 <br />BLDG 12 <br />TRAKEEB KHAN <br />PARTIAL <br />slab <br />INSULATION <br />APPROVAL <br />Notes: <br />R-10 continuous on top of existing garage slab. <br />12/26/2023 <br />12/26/2023 <br />G 08 FRAMING <br />BLDG <br />RAKEEB KHAN <br />APPROVAL <br />eTRAKiT Inspection Request <br />Notes: <br />12/25/2023 8:52 PM Perry Kethlaor <br />Contact Name: Perry Kethlaor <br />Site Address: 1711 125TH PL SE <br />Phone:4253437376 <br />e-Mail: pkethlaor@gmail.com <br />Garage conversion only. <br />BLDG 09-FIRE <br />12/26/2023 <br />12/26/2023 <br />STOPPING/BLOCKIN <br />RAKEEB KHAN <br />APPROVAL <br />G <br />Notes: <br />I <br />Printed: Tuesday, 23 April, 2024 3 of 4 rk <br />SUPERION <br />