Laserfiche WebLink
2021 Stormwater System Development <br />Fee Calculations <br />Permit M B2010-038 <br />Additional Notes: <br />Project Address: 810 33rd St <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: Replace SFR Roof <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: I Everett <br />Sewer District: Everett <br />Prepared By: AH Date: 3/2/2021 <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? INo *Reduces by 80% <br />lReviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit#: B2010-038 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />336 1 SF <br />$88.47 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Dev Fee: <br />Stormwater System Development Fees: <br />Permit #: PWXXXX-XXX Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />I SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />9 <br />