My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD 120 TERRA POWER 2024-10-25
>
Address Records
>
SEAWAY BLVD
>
3301
>
TERRA POWER
>
3301 SEAWAY BLVD 120 TERRA POWER 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 11:56:25 AM
Creation date
7/22/2024 9:58:52 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Unit
120
Tenant Name
TERRA POWER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structural <br /> Engineering & Design Inc. <br /> 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 <br /> By: Bob Project: Terra Power Project#:24-0325-11 <br /> Downaisle Seismic Loads Configuration:TYPE 1 SELECTIVE RACK <br /> Determine the story moments by applying portal analysis.The base plate is assumed to provide partial fixity. <br /> Seismic Story Forces <br /> Typical fame made <br /> — --Vlong= 756 lb - — Tribut41.5,area oftwo columns-— •-•. ----- - ----- -. ._ _.... .— _ — - <br /> Vcol=Viong/2= 378 lb of rack frame� <br /> F1= 127 lb fY\\�* ' , ..." Typical Frame made <br /> F2= 253 lb oftwo columns <br /> F3= 376 lb ' <br /> ' Top View <br /> i <br /> Front View $Ide View <br /> Seismic Story Moments Conceptual System Col <br /> Mbase-max= 8,000 in-lb < w=Default capacity h1-eff= h1-beam clip height/2 <br /> Mbase-v= (Vcol*hleff)/2 = 59 in 111111611Vcol 1 <br /> = 11,151 In-lb <=_=Moment going to base I i? <br /> Mbase-eff= Minimum of Mbase-max and Mbase-v h2 <br /> = 8,000 in-lb <br /> M 1-1= [Vcol*hleff]-Mbase-eff M 2-2= [Vcol-(F1)/2]*h2 I'--` '6 1 <br /> _ (378 lb*59 in)-8000 in-lb = [378 lb- 126.7 Ib]*62 in/2 <br /> = 14,302 in-lb = 9,754 in-lb h1 h11 <br /> eff <br /> Mseis= (Mupper+Mlower)/2 <br /> Beam to Column Elevation <br /> Mseis(1-1)= (14302 in-lb+9754 in-lb)/2 Mseis(2-2)= (9754 in-lb+5639 in-lb)/2 <br /> = 12,028 in-lb = 7,696 in-lb rho= 1.0000 <br /> Summary of Forces <br /> LEVEL hi Axial Load Column Moment** Mseismic** Mend-fixity Mconn** Beam Connector <br /> 1 62 in 4,313 lb 14,302 in-lb 12,028 in-lb 4,502 in-lb 11,571 in-lb 3 pin OK 1 <br /> 2 62 in 2,875 lb 9,754 in-lb 7,696 in-lb 4,502 in-lb 8,539 in-lb 3'pin OK <br /> 3 60 in 1,438 lb 5,639 in-lb 2,819 in-lb 4,502 in-lb 5,125 in-lb 3 pin OK <br /> Mconn= (Mseismic+Mend-fixity)*0.70*rho <br /> Mconn-allow(3 Pin)= 12,691 in-lb <br /> **all moments based on IImit states level loading <br /> type 2 select-96-Terra.xls Page tp of 6 y 3/26/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.