Laserfiche WebLink
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES I lrerracon <br /> Report Number: M7211390.0091 <br /> Service Date: 07/13/22 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 07/21/22 Lynnwood,WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Vanir Construction Management Inc Merrill Creek Operations Base Main &Ops Bldg Exp Phase 3 <br /> Attn: John Wright 7000 Hardeson Road <br /> 707 S. Grady Way, Suite 120 use middle driveway off 7100 Hardeson Road <br /> Renton,WA 98057 Everett,WA <br /> Project Number: M7211390 <br /> Permit No.: B2101-003 <br /> GENERAL INFORMATION <br /> John with Vanir Construction Management Inc. requested Mayes/Terracon be on site for concrete sampling for <br /> the slab-on-grade, which is being constructed by Forma Construction. The results of observation(s) for today <br /> were reported to John. <br /> REINFORCING STEEL <br /> Reinforcing steel was inspected today prior to placement and found to be in accordance with detail 2 on S4.20- <br /> MB. <br /> CONCRETE PLACEMENT <br /> Performed concrete sampling for the following: <br /> Element Location Yardage Supplier Mix ID Mix Description <br /> Slab-on- Paint mix booth slab-on-grade west side 21 Cadman S4W50486 Normal Weight,4000-psi, <br /> grade of the building on the exterior air-entrained concrete <br /> Placement Method: Chute, concrete was vibrated for consolidation. <br /> TESTS PERFORMED <br /> The following tests were performed and were in accordance with project specifications: Slump, Air Content, <br /> Temperature. <br /> Cast a set of(4) cylinders for lab-curing and compressive strength testing <br /> COMPLIANCE STATEMENT <br /> Based on our observations, cast-in-place concrete construction activities at the above-referenced locations <br /> appeared to be completed in general accordance with the project plans and specifications. <br /> Services: Special Inspections/Materials Testing <br /> Mayes/Terracon Rep.: Michael Mattox <br /> Reported To: Vanir Construction Management Inc. <br /> Contractor: Forma Construction <br /> Report Distribution: <br /> (1)Vanir Construction Management (1)City of Everett WA,Kurt Keck <br /> Inc,John Wright <br /> (1)Community Transit,Larry (1)Jimale Technical Services LLC, Reviewed By: <br /> Daubenmire Tom Donnelly - <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc, Barry Tuttle <br /> Donna Pollard Todd Wirtz <br /> (1)Vanir Construction Management (1)Vanir Construction Management Project Field Manager <br /> Inc,Dan McNay Inc,John Turk <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />