Laserfiche WebLink
STRUCTURAL STEEL OBSERVATIONS REPORT MAYES I lrerracon <br /> Report Number: M7211390.0079 <br /> Service Date: 06/16/22 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 06/21/22 Lynnwood,WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Vanir Construction Management Inc Merrill Creek Operations Base Main &Ops Bldg Exp Phase 3 <br /> Attn: John Wright 7000 Hardeson Road <br /> 707 S. Grady Way, Suite 120 use middle driveway off 7100 Hardeson Road <br /> Renton,WA 98057 Everett,WA <br /> Project Number: M7211390 <br /> Permit No.: B2101-003 <br /> GENERAL INFORMATION <br /> John with Vanir Construction Management requested Mayes/Terracon be on site for Welding Observation. <br /> Structural steel is being constructed by Moe Welding and Erection. The results of observation(s) for today were <br /> reported to John with Vanir Construction Management. <br /> The construction documents referenced for this observation include: Structural plans. <br /> Inspected the structural steel framing for the mezzanine level inside the building. Inspected the installed high <br /> strength A325 structural bolts and noted that the bolts were installed and tightened to a snug-tight condition. <br /> Inspected the button punching of the metal deck side seams, the hand welding of the 3/4" diameter shear studs <br /> and the spacing and total count of studs. Noted that the studs were all welded on by hand and welds were <br /> acceptable. Inspected the reinforcing steel placed in this location as well and found per plans and typical details. <br /> Inspected the welding of the skylight frames and noted that some were missing welds. Advised the contractor <br /> that each tab needs to be welded on each side as shown in detail 9 on S5.02-MB. Inspected the welding of the <br /> bridging for the joists and found per structural details. Inspected the welding of the plate washers at the column <br /> base plates. This was not shown on the plans, but the contractor requested that these get noted in the report for <br /> today. They provided welds on (2) sides on the plate washers at all column base plates. Noted that the missing <br /> welds at the column top to the joists, noted as missing, have not been welded at this time. Verified that the A325 <br /> bolts at grid lines M/1 (southeast corner beam connection) have been installed and the bolts are snug-tight. <br /> Note: One side of the shear tabs has not yet been welded to the embed at this location, at the time of inspection. <br /> WELDING OBSERVATION <br /> Welding was performed prior to Mayes/Terracon's arrival. Welding procedures could not be verified. Welder <br /> qualifications could not be verified. <br /> Inspection Referenced Compliance <br /> Type Elevation/Location Connection Type Type of Weld Documents Applicable Code Status <br /> Periodic Mezzanine level Decking puddle welds Fillet S1.22-MB AWS D1.1 Static Complies <br /> and shear studs <br /> COMPLIANCE STATEMENT <br /> Based on our observations, structural steel construction activities at the above-referenced locations appeared to <br /> be completed in general accordance with the project plans and specifications. <br /> Services: Special Inspections/Materials Testing <br /> Mayes/Terracon Rep.: Michael Mattox <br /> Reported To: Vanir Construction Management <br /> Contractor: Moe Welding and Erection <br /> Report Distribution: <br /> (1)Vanir Construction Management (1)City of Everett WA,Kurt Keck <br /> Inc,John Wriqht <br /> (1)Community Transit,Larry (1)Jimale Technical Services LLC, Reviewed By: <br /> Daubenmire Tom Donnelly - <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc, Barry Tuttle <br /> Donna Pollard Todd Wirtz <br /> (1)Vanir Construction Management (1)Vanir Construction Management Project Field Manager <br /> Inc,Dan McNay Inc,John Turk <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />